News Release
You are viewing ARCHIVED content published online before January 20, 2025.
Please note that this content is NOT UPDATED, and links may not work. For current information,
visit https://www.nps.gov/aboutus/news/index.htm.

NPS / Jacob W. Frank
Subscribe
![]() |
Contact: Morgan Warthin, (307) 344-2015
- Effective immediately, the road between Mammoth Hot Springs and Norris Junction is open.
- National Park Service crews worked through the night to locate and temporarily repair a major water line break that supplies water to all of the Mammoth Hot Springs facilities.
- The water main break was located under the road between the Mammoth Hot Springs Terraces and the YCC Camp Road (located about one mile south of the terraces). The break occurred on August 14.
- The park will plan a permanent fix on the line this fall once visitation and vehicle traffic subsides.
- Photos of the incident are posted on Flickr.
- For up-to-date information visit go.nps.gov/YellRoads, call (307) 344-2117 for a recorded message, or sign up to receive Yellowstone road alerts on your mobile phone by texting "82190" to 888-777.
Last updated: August 15, 2020