Yosemite National Park's Merced River Restoration Strategy [2.6 MB PDF] articulates the vision guiding planned and ongoing efforts to restore the Merced River in Yosemite Valley, and explains the rationale for the measures being pursued to achieve that vision. It provides context for restoration measures so that stakeholders, practitioners, managers, and the general public can understand why actions are being done.

Recommended Restoration Actions Near Sugar Pine Bridge

As one of the key elements of the Merced River Restoration Project, and as directed by the Merced River Plan, recommendations have been developed focused specifically on the reaches immediately downstream and upstream of Sugar Pine Bridge, to mitigate for the localized impacts associated with the bridge.

 

Restoration Strategy

The river in the vicinity of Sugar Pine Bridge is over-widened, locally confined within its banks by riprap, and largely disconnected from its once-active floodplain. Four broad categories of active restoration approaches have been identified for implementation: (1) reconstruction, replanting, and protection of the riparian zone; (2) encouragement of more frequent overbank flooding and off-channel flows; (3) restoration of dynamic river and tributary channels; and (4) creation of more complex in-channel habitat. Four alternatives, consisting of different combinations of potential restoration actions, were evaluated using multiple geomorphic, hydraulic, and ecological criteria. A cost-benefit analysis weighed the restoration benefits and estimated construction costs of each alternative, and also considered the risks and recommended mitigations for the design elements that make up the alternatives. One alternative constitutes the Recommended Action, whose multiple components are recommended for final design and construction. Evaluation criteria for monitoring the project success after construction are also provided, in order to evaluate the long-term effects of a mitigated Sugar Pine Bridge on the biological and hydrological Outstandingly Remarkable Values of the Merced River through Yosemite Valley.

 
Basis of Design Report Cover
Basis of Design Report

Details of the alternative actions, their evaluation, and the basis for final recommendations can be found in the Basis of Design, Phase 3 Final Report [6.2 MB PDF].

Timeline

This recently completed project was conducted over a 5-year period (2015–2020). A variety of data-compilation, data-collection, and mapping efforts were conducted to develop a comprehensive characterization of the river reaches surrounding Sugar Pine Bridge and associated riparian and floodplain areas, addressing their geomorphic, hydrologic, and vegetative attributes and conditions. The overarching restoration strategy was developed in close coordination with the National Park Service, with its first tangible being the construction of four such projects in the summers of 2016, 2017, 2018, and 2019.

Project Team

The project team was led by researchers from the University of California Santa Barbara, with long histories in both the theory and the practice of river restoration. Other team members provided key areas of expertise to ensure a well-informed, broad-based framework:

  • Derek B. Booth, PhD, PE, PG (Adjunct Professor, UC Santa Barbara): Principal Investigator; Project Management, Watershed Hydrology, Fluvial Geomorphology.

  • Thomas Dunne, PhD (Professor, UC Santa Barbara): Fluvial Geomorphology.

  • Eric Larsen, PhD (Research Scientist, UC Davis): Fluvial Geomorphology.

  • Katie Ross-Smith, PhD, Virginia Mahacek (Senior Scientists, Cardno Inc.): River and Riparian Zone Management and Engineering.

  • David Ceppos (Senior Mediator, California State University Sacramento, Center for Collaborative Policy [CCP]): Stakeholder Engagement and Collaboration.

  • Greg Stock, PhD, PG, (Geologist, National Park Service), Quaternary Geology, Geomorphology, Geochronology
  • Jim Roche (Hydrologist, National Park Service)
  • Catherine Fong (Hydrologist, National Park Service)
  • Elizabeth Haddon, MSc (Geologist, U.S. Geological Survey): Quaternary Geology, Geomorphology, Sedimentology.

 

Stakeholder Meetings

Periodic stakeholder meetings are held to provide a forum for public input to the research and restoration process.

Date

Presentation/Documents

October 2019

Stakeholder Meeting to Present Recommendations and Invite Input

November 2017

Stakeholder Meeting to Discuss Progress and Invite Input [145 kb PDF]

May 2017

Stakeholder Meeting to Report on Study Progress

May 2016

Merced River Hydrology Study, Yosemite National Park [460 kb PDF]

May 2016

Overview of Merced River Restoration Research Project [2 MB PDF]

 

Last updated: November 30, 2020

Park footer

Contact Info

Phone:

209/372-0200

Contact Us