On-line Book
Book Cover
Cover Page


MENU

Table of Contents

Abstract

Acknowledgments


Introduction

Essay

Brief History

Gila River

Granada

Heart Mountain

Jerome

Manzanar

Minidoka

Poston

Rohwer

Topaz

Tule Lake

Isolation Centers

Add'l Facilities

Assembly Centers

DoJ and US Army Facilities

Prisons


References

Appendix A

Appendix B

Appendix C





Confinement and Ethnicity:
Barbed wire divider
An Overview of World War II
Japanese American Relocation Sites

by J. Burton, M. Farrell, F. Lord, and R. Lord

clip art


Chapter 6 (continued)
Heart Mountain Relocation Center

Farm field, Heart Mountain
Figure 6.9. Farm field at Heart Mountain.
(Hikaru Iwasaki photograph, Bancroft Library, University of California, Berkeley)
Water for domestic use was pumped from the river (at the "low-level pumping plant") to a filter plant and pumping station (the "high-level pumping plant") across the highway from the warehouse area. Water was then pumped to a concrete reservoir on a low ridge northwest of the residential area.

Water for farming came from canals, most already in place from the Bureau of Reclamation's (BOR) Heart Mountain Reclamation Project. Evacuees, however, did construct 1 mile of canal, and used 850 tons of bentonite to waterproof some of the existing canal sections that leaked (Mackey 1998). A little over 1,000 acres were cleared for farming. Fields were located adjacent to the south and east of the central area, including across (east of) the highway. Other fields were located to the north and along both sides of the highway from the central area to 3-1/2 miles south (Figures 6.8 and 6.9).



farm fields map of Heart Mountain Relocation Center
Figure 6.8. Farm fields at the Heart Mountain Relocation Center.
(National Archives)
(click image for larger size (~156K) )

barracks,
Figure 6.10. Transporting barracks from Heart Mountain.
(Big Horn Basin Project Photography Collection, John Taggart Hinckley Library, Northwest College)
After the relocation center was closed, buildings and equipment were auctioned off and farmers moved in to homestead the area (Figure 6.10). The farmers benefitted from the canal construction and repair and the land clearing accomplished by the evacuees. The BOR retained buildings in the hospital and staff housing area for offices, storage, and maintenance shops. Subsequently, the local Irrigation District used the buildings until 1980 (Larson et al. 1995).

There have been several recent studies of the relocation center, which provide information on the past history and current condition. In 1983 Michael Gorman of the Wyoming Recreation Commission reviewed the history of the camp and completed a National Register nomination for the hospital complex, which is located on BOR land. The parcel was listed on the National Register of Historic Places in 1985. In 1986 real estate appraiser George Page developed salvage estimates for two of the wood frame buildings in the staff housing area. His assessment provides information about construction details and the condition of the buildings at that time, which suffered from neglect and vandalism (Page 1986).

For a pipeline project, Welch et al. (1988) recorded features in the warehouse area, and noted extensive disturbance from fields and other agricultural activities. Additional features and artifacts of the hospital and administration complexes were recorded as part of a cultural resources inventory by Penny et al. (1990), who recommended that the National Register district be expanded to include the entire BOR parcel. Rose (1992) prepared a condition assessment of the four standing buildings for the BOR, and Larson et al. (1995) presented a paper at the Society for Historical Archaeology meetings which outlined the history of the center and its research potential.

Continued Continue





Top




Last Modified: Fri, Sep 1 2000 07:08:48 pm PDT
http://www.cr.nps.gov/history/online_books/anthropology74/ce6b.htm

National Park Service's ParkNet Home