You are viewing ARCHIVED contentThis content was published online before January 20, 2025. Please note that this content is NOT UPDATED, and links may not work. For current information, visit https://www.nps.gov/aboutus/news/index.htm.
News Release Date: September 1, 2017 Sidewalk repair and repointing of the landings at the start of the wooden towpaths will require temporary closure of the upper towpaths. One walkway will remain open at all times for pedestrian use. Repairs to the sidewalks on the bridge deck will require occasional delays over a three day period. Flaggers will direct vehicle traffic crossing the bridge during this phase of the project. For more information, please contact Carla Hauser Hahn at (570) 729-8251 x 2226 or e-mail us. |
Last updated: September 1, 2017