News Release
You are viewing ARCHIVED content
This content was published online before January 20, 2025. Please note that this content is NOT UPDATED, and links may not work. For current information, visit https://www.nps.gov/aboutus/news/index.htm.
News Release Date: June 11, 2024
Contact:
Raymond Hamel, 770-615-1800
In 2017, Kennesaw Mountain National Battlefield Park proposed the use of parking fees and a daily shuttle system to transport visitors on Kennesaw Mountain Drive, between the Visitor Center and the summit of Big Kennesaw Mountain, to eliminate single passenger vehicle use, and decrease conflicts between vehicles, pedestrians, and cyclists.
In preparation for expanding the shuttle system, the park is considering the timing of bicycle use on the road when the shuttle is not in operation and is preparing to better delineate uses on the road. The proposed redesigned road lanes would include a 10-foot shared bus/bike lane on the inside curve with 2-way traffic and a 10-foot pedestrian lane on the outside curve. New pavement markers would be painted along the 1.2 miles of road to delineate separation between pedestrian and bike/bus lanes. In addition, a new shuttle stop would be constructed at the base of Kennesaw Mountain Drive next to the Visitor Center.
Please visit https://parkplanning.nps.gov/documentsOpenForReview.cfm... for more information. Comments can be submitted on the website from June 10, 2024 to July 12, 2024.
Last updated: June 26, 2024