Design
Forms
Templates
Samples
Guidelines and Guidance
Construction
Forms
Templates
Samples
Guidelines
- SharePoint
- 1.1A External Account Creation and Log-In Guide (pdf)
- 1.1B External Account Password Change Guide (pdf)
- 1.1C SharePoint Training Documents (slide show format)
- These training documents (slide show format) are located on the NPS\DSC SharePoint Project website. You must log-in to access these training documents.
- To view a slide show, do the following:
- Click on the name of the training document.
- To navigate through the slide show, click on the slide or use the arrow keys on the keyboard.
- To view a slide show in full screen, click Start Slide Show.
- For additional navigation tools, mouse-over the bottom left of the slide.
- To exit, close the window or press Esc.
- To navigate back to the list of training documents, click Training Documents in the breadcrumb on the brown band or click the X on the upper right directly below the brown band.
- 1.1D Steps for Frequent SharePoint Tasks (pdf)
- How to Upload a Document
- How to Locate a Document
- How to Review a Document
- How/Why to Check-Out a Document
- How to Edit a Document
- How to set/remove an Alert on a Library, Folder, or Document
- How to set your Site to a Trusted Site for Better User Experience
- 1.1E Overview of the SharePoint RFI/Submittal Process (pdf)
- 1.1F Overview of the SharePoint RFP Process (pdf)
- 1.2A & 2.2.1C Draft DSC SOP Policy letter on Public Utilities (pdf)
- 1.2B Types of Permits (pdf)
- 1.2C & 2.2.1B Utility Contract Request Checklist (pdf)
- 1.2D WASO SOP For Public Utility Teriff Contracting (pdf)
- 1.2E & 2.2.1E (Revision 1) WASO SOP for Public Utilities (pdf)
- 1.2F & 2.2.1F FAR Clause 52-236-07
- 1.3A DO 65 Explosives use and Blasting Safety
- 1.3B DO 50B Occupation Safety and Health program
- 1.4A Under-an-Acre Pollution Prevention Plan (UPPP) (pdf) - SharePoint
- 1.5A Baseline Schedule Review Checklist
- 2.1.1A Submittal Review Process Flowchart (pdf) - Hard Copy Process
- 2.1.1B Submittal Review Process (pdf) - Hard Copy Process
- 2.1.2A Electronic Submittal Review Process Flowchart (pdf) - SharePoint
- 2.1.2B Electronic Submittal Review Process (pdf) - SharePoint
- 2.2.1A Utility Company Coordination (pdf)
- 2.2.1D WASO SOP for Public Utilities (pdf)
- 2.2.3A CMR's Role in Coordination with Park and Concessionaire (pdf)
- 2.3.5A FAR PAR 52.222-8
- 2.3.6A WH347 Instructions (pdf)
- 2.3.6B FAR 52.222-4
- 2.4.5A DSC Policy Letter on Invoice Processing (pdf)
- 2.4.5B Prompt payment for Construction Contracts 52.232-27 (pdf)
- 2.4.6A Rejection of Work (pdf)
- 2.4.7A RFI Process (pdf) - SharePoint
- 2.4.7B RFI Instructions (pdf) - SharePoint
- 2.5.1A Corp of Engineers construction equipment ownership and operating expense schedule (Click on link for "View Pamphlet" for appropriate region, pricing information found in Chapter 2.)
- 2.5.1B DSC-06 Pricing of Adjustments (Feb 03) (pdf)
- 2.5.2A DSC-SOP Use of CODs (pdf)
- 2.5.3A FAR 52.248-3 Value Engineering - Construction
- 2.5.3B VECP Routing and Processing Flowchart (pdf)
- 2.6.1A & 2.8.1A DSC SOP 2006-006 Beneficial Occupancy vs. Substantial Completion (pdf)
- 2.6.1B & 2.8.1B DSC SOP 2006-006 Definitions (pdf)
- 2.6.1C & 2.8.1C Type of Use and Possession Chart (pdf)
- 2.7.1A Operation & Maintenance (O&M) Manual Procedure (pdf)
- 3.2A Guideline No. 60 - Fixed Assets (pdf)
- 3.2B Pacific West Directive PW-038, Completion Report Procedure (pdf)
|