Preservation Work Proceeding

You are viewing ARCHIVED content

This content was published online before January 20, 2025. Please note that this content is NOT UPDATED, and links may not work. For current information, visit https://www.nps.gov/aboutus/news/index.htm.

News Release Date: May 30, 2012
Contact: Maureen McGee-Ballinger, 605-574-3115

KEYSTONE, S.D. -  The preservation team at Mount Rushmore National Memorial will be working on the sculpture beginning Thursday, May 31. Visitors can expect to see members of the preservation team visible on the faces and the mountain conducting preservation monitoring. Portions of the popular Presidential Trail and the Lakota, Nakota and Dakota Heritage Village will be closed periodically, as equipment is moved using a part of the trail and village corridor.
 
The preservation team will be upgrading the rock block monitoring system to enhance conservation efforts on the sculpture. Rock block monitoring is just one phase of a larger long-term preservation plan. Utilizing new and developing technologies, this systematic approach to preservation builds upon past conservation work dating back to the time of artist Gutzon Borglum’s first efforts to seal and protect the Memorial.
 
The Mount Rushmore preservation team is composed of a wide variety of specialists from across park divisions. Rope access technicians are trained to use a dual rope system where each technician is attached to a working line and a safety, backup line at all times while performing work directly on the surface of the sculpture. The Mount Rushmore team is the only certified industrial ropes team in the National Park Service.
 

RSS Feed | What is RSS?

Last updated: June 18, 2017

Park footer

Contact Info

Mailing Address:

13000 Highway 244
Building 31, Suite 1

Keystone, SD 57751

Phone:

605 574-2523
Park information. Please leave a voicemail and the park will return your inquiry as soon as possible.

Contact Us