Furnishings and artifacts are packed for storage. Visit Packing the 2nd Floor for more information on this stage of the project. ![]() NPS PHOTO
Flooring finishes including carpet, padding and hardboard finishes are removed. Floorboards are removed intact whenever possible. Hand tools or fine-bladed power tools are used to remove boards with minimal damage. NPS PHOTO
Park woodcrafter records floorboard locations on a diagram. When the construction project is completed, the floor will be reassembled with each board returned to its original location. ![]() NPS PHOTO
Floorboards are marked with location numbers that correspond to the floor diagram, then carefully stacked away from the construction area for storage. |