Furnishings and artifacts are packed for storage. Visit Packing the 2nd Floor for more information on this stage of the project.
NPS PHOTO
Flooring finishes including carpet, padding and hardboard finishes are removed. Floorboards are removed intact whenever possible. Hand tools or fine-bladed power tools are used to remove boards with minimal damage. NPS PHOTO
Park woodcrafter records floorboard locations on a diagram. When the construction project is completed, the floor will be reassembled with each board returned to its original location.
NPS PHOTO
Floorboards are marked with location numbers that correspond to the floor diagram, then carefully stacked away from the construction area for storage. |