In May, the contractor returned to the Pretty Rocks construction site for their final season of work. They completed the deck panel and guardrail installation across the bridge during the first few weeks. They are now welding in place the precast walls at the west abutment.

At the perlite slide near the east abutment, the contractor has also begun work on a gabion wall structure. The gabion wall is a type of retaining wall contructed out of metal cages filled with rocks.

A row of wire cages filled with rocks sits along the shoulder of the road at the base of a steep slope. Behind the constructino site, the Pretty Rocks bridge is visible.The first layer of the gabion wall.
Photo courtesy of FHWA

Two workers lying sideways welding at the base of a wall.Track welding the backwalls at the west abutment.
Photo courtesy of FHWA

Last updated: June 1, 2026

Park footer

Contact Info

Mailing Address:

PO Box 9
Denali Park, AK 99755

Phone:

907 683-9532
A ranger is available 9 am to 4 pm daily (except on major holidays). If you reach the voicemail, please leave a message and we'll call you back as soon as we finish with the previous caller.

Contact Us