Grant Circle and North Union Ave Repairs

Road with damage including large crack and sections of the road dropped a few feet
Section of North Union Ave damaged by storms in early 2020

NPS Photo

Project Overview

Following heavy rainfall in early 2020, Grant Circle and a section of Union Avenue suffered catastrophic failures necessitating the closure to ensure visitor safety. This project will repair these damages, stabilize slopes and soil, and allow the road to be reopened for vehicle and pedestrian access.

Both sites are scheduled to be completed congruently meaning both sites will have construction on them for the duration of the project. Grant Circle is scheduled to be completed first and at that time the contractor will move all resources to finish North Union Ave.

During the project, there will be no pedestrian access or vehicular access to the construction areas.

 
Center of image is very tall wall made up of gray stone in wire rectangles. On either side of the wall are light brown exposed earthen cliff faces. Blue sky above with trees grown on top of cliffs.
At the base of the gabion wall being built at Grant Circle August 2025

NPS/Neal Downey

Current Status

Update August 18, 2025

  • North Union

    • Contractor has finished all aggregate piers and is reaching final grading before installation of under drain and load transfer platform.

  • Grant Circle

    • Progress has reached the 15th tier of the gabion wall, which is 2 levels shy of being complete.

Work will include:

  • Install new Stormwater control infrastructure and management features
  • Slope and Soil Stabilization
    • Install reinforced soil slope walls and install gabion baskets
    • Install Rammed Aggregate Piers
    • Install Load Transfer Platform
    • Turf replacement/establishment
  • Roads
    • Roadway excavation and embankment construction
    • Remove and replace pavement on roads and Thayer’s Approach Bridge
    • Remove and replace curbs
    • New pavement striping
 
 
Grant and Union Ave Map for 2025 Repairs
Map of Grant and Union Road Repairs 2025

NPS Photo

Timeline:

March 2025 – early January 2026 (estimated – weather dependent)

 