Annual ReportingAs part of the Programmatic Agreement in the General Management Plan, Kalaupapa NHP provides an annual report of all activities reviewed through streamlined or standard compliance. VII. REPORTING AND ANNUAL REVIEW A. The Park shall prepare and submit an Annual Report to SHPO and Consulting Parties no later than one calendar year following execution of this Agreement and every year afterward for so long as this Agreement remains in force. The Annual Report shall summarize activities carried out under the terms of this Agreement for the preceding calendar year and review the implementation of the terms of this Agreement to determine whether amendments are needed. B. The Annual Report shall include projects, plans, CRM Team, their qualifications and recent training, updated inventories, initiatives, and identifications of any amendments needed. The Annual Report will also include the streamlined review data and basic data described in the Nationwide PA and undertakings subject to the standard review process including the provisions in II of this PA. The Annual Report submitted to the SHPO will include the archaeological reports completed during the year. E. Hard copies of the annual report will be provided to the Kalaupapa kupuna (patient-residents) and the Park will schedule a meeting for them. Any comments offered may be considered in Section 106 consultation on those projects. F. The Park shall also make the Annual Report available for public inspection. FY 2025 GMP PA Annual ReportRequired members: Section 106 Coordinator, Archeologist, Historical Landscape Architect, Curator, Anthropologist, Historian, Historical Architect PEPC Projects The following drop downs are each of the Planning, Environment & Public Comment (PEPC) projects subject to Standard Review and Streamlined Review that were completed in Fiscal Year 2025 at Kaluapapa NHS.
Target Start: Jun 1, 2025 Target Start: Jan 13, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Water System Status: Closed Complete Category: Cyclic Maintenance Target Start: Jan 13, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Electrical System Status: Closed Complete Category: Routine Maintenance Target Start: Jan 13, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Building Status: Closed Complete Category: Routine Maintenance Target Start: Jan 15, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Building Status: Closed Complete Category: Routine Maintenance Target Start: Jan 21, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Water System Status: Closed Complete Category: Routine Maintenance Target Start: May 1, 2025
Assessment of Effect: No Potential to Cause Effects Documentation Method: Memo to Project File Project Category: Marine & Estuarine Ecosystem, Research, Coral Reef, Invertebrate, Threatened and Endangered Species, Habitat Connectivity, Native Resource Status: Closed Complete Category: Resource Management Target Start: Feb 26, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Historic Asset, Housing Status: Closed Complete Category: Emergency Repair Target Start: Feb 26, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Signs Status: Closed Complete Category: Routine Maintenance Target Start: Feb 27, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Building Status: Closed Incomplete Category: Other Natural/Cultural Resource Activities Target Start: Feb 26, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Building, Historic Asset Status: Closed Complete Category: Routine Maintenance Target Start: Mar 3, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Other Status: Closed Complete Category: Commercial Use Authorization Target Start: Jun 30, 2025
Assessment of Effect: No Potential to Cause Effects Documentation Method: CE Project Category: Archeological Resource, Research, Interpretive Media, Cultural Landscape, GIS Data, Audio Visual Media Status: Closed Complete Category: Research Permit Target Start: Mar 19, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Building, Housing Status: Closed Complete Category: Routine Maintenance Target Start: May 1, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Archeological Resource Status: Proposed Category: Cultural Resource Management Plan Target Start: May 11, 2025
Assessment of Effect: No Potential to Cause Effects Documentation Method: CE Project Category: Other Status: Closed Complete Category: Special Use Permit Target Start: May 24, 2025
Assessment of Effect: No Potential to Cause Effects Documentation Method: Memo to Project File Project Category: Other Status: Closed Complete Category: Special Use Permit Target Start: May 20, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Mowable Area, Fuel Management, Fire Suppression System, Vegetation Status: Closed Complete Category: Cyclic Maintenance Target Start: May 28, 2025
Assessment of Effect: No Potential to Cause Effects Documentation Method: Memo to Project File Project Category: Other Status: Closed Complete Category: Special Use Permit Target Start: Jun 16, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Historic Asset Status: Closed Complete Category: Preservation Target Start: Aug 18, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Historic Asset, Monument Status: Closed Complete Category: Historic Preservation Target Start: May 28, 2025
Assessment of Effect: No Potential to Cause Effects Documentation Method: Memo to Project File Project Category: Other Status: Closed Complete Category: Special Use Permit Target Start: Oct 20, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Building, Electrical System, Parking Area, Fleet Status: Proposed Category: Routine Maintenance Target Start: Aug 15, 2025
Assessment of Effect: TBD Documentation Method: TBD Project Category: Other Status: Proposed Category: Special Use Permit Target Start: Sep 19, 2025
Assessment of Effect: TBD Documentation Method: TBD Project Category: Other Status: Proposed Category: Special Use Permit Target Start: Sep 25, 2025
Assessment of Effect: TBD Documentation Method: TBD Project Category: Other Status: Proposed Category: Special Use Permit Target Start: Dec 1, 2025
Assessment of Effect: No Adverse Effect Documentation Method: Streamlined Review Project Category: Building, Museum Collection Status: Proposed Category: Repair/Rehabilitation Target Start: Dec 15, 2025
Assessment of Effect: No Potential to Cause Effects Documentation Method: TBD Project Category: Other Status: Proposed Category: Special Use Permit 128060
128370 128400 128401 128707 129190 129240 129250 129252 129455 129803 129909 130999 131094 131095 131266 133187 FY 2024 GMP PA Annual Report Required members: Section 106 Coordinator, Archeologist, Historical Landscape Architect, Curator, Anthropologist, Historian, Historical Architect)
Regional 106 Reviewer: Sarah Killinger* Anthropologist: Kaohulani McGuire* Archeologist: Dusten Robins* Cultural Resource Specialists: Michael Owens*, Dusten Robins*, Kaohulani McGuire* Curator: Katie Matthew* Historian/National Historic Landmark Coordinators: Elaine Jackson-Retondo*, Christopher Johnson* Historical Architects: Elle Farias (Jan. – Feb. 2024), Doug Wilson (Mar. – Apr. 2024, Jared Infanger (May -June 2024), Mark Slater (July – Sept. 2024, Juan Ocampo (Oct-Dec. 2024) Historical Landscape Architect: Vida Germano * 106 Coordinator: Ka’ohulani McGuire* NHPA Specialists: Michael Owens, Dusten Robins*, Ka’ohulani McGuire* * CR team members throughout the full reporting period Superintendent: Nancy Holman
Natural Resources Manager: Linh Anh Cat Marine Resources: Kelly Moore
Terrestrial Resources and Pest Control: Albert Espaniola
Law Enforcement, Visitor and Resource Protection: Amy Sakurada Facilities and Maintenance Manager: Matt Padgett Waste Management, Grounds, Contracts: Pa’oneakai Lee-Namaka’eha
Utilities (Water, Wastewater and Power): Joe Mollena, Eddie English Historic Preservation Work: Joe Kaiama Community Engagement, Interpretation, Hawaiian/Historical Context: Miki’ala Pescaia Museum and Archive collections: Katie Matthew Administrative Support and Budget: Rosa Key, Jessica Sanchez PEPC Projects The following drop downs are each of the Planning, Environment & Public Comment (PEPC) projects subject to Standard Review and Streamlined Review that were completed in Fiscal Year 2024 at Kaluapapa NHS.
Superintendent Approval Date: 1/16/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 1 - Preservation Maintenance and Repair of Historic Properties Project Completed: Yes - 2/13/24 Category: Facilities Maintenance Superintendent Approval Date: 1/31/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 10 - Erection of Signs, Wayside Exhibits, and Memorial Plaques Project Completed: Yes - 8/14/24 Category: Natural Resource Management Superintendent Approval Date: 2/7/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 1 - Preservation Maintenance and Repair of Historic Properties,14 - Mechanical, Electrical and Plumbing Systems Project Completed: Ongoing Category: Facilities Maintenance Superintendent Approval Date: 2/7/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 9 - Maintenance or Replacement of Non-Historic Utility Lines, Transmission Lines, and Fences Project Completed: Ongoing Category: Natural Resource Management Superintendent Approval Date: 2/8/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 1 - Preservation Maintenance and Repair of Historic Properties,14 - Mechanical, Electrical and Plumbing Systems Project Completed: Yes - 9/11/24 Category: Facilities Maintenance Superintendent Approval Date: 4/10/2024
Assessement of Affect: No Potential to Cause Effects Documentation Method: Memo to Project File Streamline Review Activity: Project Completed: Ongoing Category: Natural Resource Management Superintendent Approval Date: 4/10/2024
Assessement of Affect: No Potential to Cause Effects Documentation Method: Memo to Project File Streamline Review Activity: Project Completed: Yes - 5/30/24 Category: Natural Resource Management Superintendent Approval Date: 5/13/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 4 - Health and Safety Activities,7 - Hazardous Fuel and Fire Management Project Completed: Yes - 12/31/24 Category: Natural Resource Management Superintendent Approval Date: 5/16/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 9 - Maintenance or Replacement of Non-Historic Utility Lines, Transmission Lines, and Fences Project Completed: Yes - 4/17/24 Category: Facilities Maintenance Superintendent Approval Date: 5/16/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 8 - Installation of Environmental Monitoring Units Project Completed: Ongoing Category: Natural Resource Management Superintendent Approval Date: 5/16/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 4 - Health and Safety Activities,14 - Mechanical, Electrical and Plumbing Systems Project Completed: Yes - 9/25/24 Category: Facilities Maintenance Superintendent Approval Date: 5/16/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 8 - Installation of Environmental Monitoring Units Project Completed: Yes - 12/31/24 Category: Natural Resource Management Superintendent Approval Date: 5/16/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 3 - Repair/Resurfacing/Removal of Existing, Roads, Trails and Parking Areas,4 - Health and Safety Activities Project Completed: Yes - 12/31/24 Category: Natural Resource Management Superintendent Approval Date: 5/23/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 14 - Mechanical, Electrical and Plumbing Systems Project Completed: Yes - 1/15/25 Category: Facilities Maintenance Superintendent Approval Date: 7/2/2024
Assessement of Affect: No Adverse Effect Documentation Method: Standard 4-Step Process Streamline Review Activity: Project Completed: Ongoing Category: Facilities Maintenance Superintendent Approval Date: 7/9/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 14 - Mechanical, Electrical and Plumbing Systems Project Completed: Yes - 12/15/24 Category: Facilities Maintenance Superintendent Approval Date: 7/9/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 8 - Installation of Environmental Monitoring Units Project Completed: Ongoing - PCE Category: Natural Resource Management Superintendent Approval Date: 7/9/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 4 - Health and Safety Activities,14 - Mechanical, Electrical and Plumbing Systems Project Completed: Yes - 8/14/24 Category: Facilities Maintenance Superintendent Approval Date: 7/9/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 5 - Routine Grounds Maintenance Project Completed: Yes - 10/16/24 Category: Natural Resource Management Superintendent Approval Date: 7/9/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 8 - Installation of Environmental Monitoring Units Project Completed: Ongoing Category: Natural Resource Management Superintendent Approval Date: 7/15/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: Project Completed: Ongoing Category: Facilities Maintenance Superintendent Approval Date: 7/15/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 5 - Routine Grounds Maintenance,9 - Maintenance or Replacement of Non-Historic Utility Lines, Transmission Lines, and Fences Project Completed: Ongoing - PCE Category: Natural Resource Management Superintendent Approval Date: 7/22/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 5 - Routine Grounds Maintenance Project Completed: Yes - 10/16/24 Category: Natural Resource Management Superintendent Approval Date: 8/19/2024
Assessement of Affect: No Adverse Effect Documentation Method: Standard 4-Step Process Streamline Review Activity: Project Completed: Yes - 6/20/24 Category: Facilities Maintenance Superintendent Approval Date: 8/22/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 4 - Health and Safety Activities,7 - Hazardous Fuel and Fire Management,14 - Mechanical, Electrical and Plumbing Systems Project Completed: Yes - Aug 28 Category: Natural Resource Management Superintendent Approval Date: 8/22/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 5 - Routine Grounds Maintenance Project Completed: Ongoing Category: Facilities Maintenance Superintendent Approval Date: 8/22/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 8 - Installation of Environmental Monitoring Units Project Completed: Closed Incomplete Category: Superintendent Approval Date: 8/22/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 4 - Health and Safety Activities, 5 - Routine Grounds Maintenance Project Completed: Ongoing Category: Facilities Maintenance Superintendent Approval Date: 8/22/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 14 - Mechanical, Electrical and Plumbing Systems Project Completed: Yes - 8/15/24 Category: Facilities Maintenance Superintendent Approval Date: 8/26/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 1 - Preservation Maintenance and Repair of Historic Properties Project Completed: Ongoing Category: Facilities Maintenance Superintendent Approval Date: 9/12/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 4 - Health and Safety Activities, 5 - Routine Grounds Maintenance, 7 - Hazardous Fuel and Fire Management Project Completed: Ongoing Category: Facilities Maintenance Superintendent Approval Date: 9/16/2024
Assessement of Affect: No Potential to Cause Effects Documentation Method: Memo to Project File Streamline Review Activity: Project Completed: Category: Permit - Special Use Superintendent Approval Date: 9/30/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 1 - Preservation Maintenance and Repair of Historic Properties Project Completed: Ongoing Category: Facilities Maintenance Superintendent Approval Date: 10/8/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 1 - Preservation Maintenance and Repair of Historic Properties, 2 - Rehabilitation and/or Minor Relocation of Existing Trails, Walks, Paths, and Sidewalks, 3 - Repair/Resurfacing/Removal of Existing, Roads, Trails and Parking Areas, 4 - Health and Safety Activities, 5 - Routine Grounds Maintenance, 10 - Erection of Signs, Wayside Exhibits, and Memorial Plaques, 11 - Culvert Replacement Project Completed: Ongoing - PCE Category: Facilities Maintenance Superintendent Approval Date: 10/8/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 1 - Preservation Maintenance and Repair of Historic Properties, 2 - Rehabilitation and/or Minor Relocation of Existing Trails, Walks, Paths, and Sidewalks, 3 - Repair/Resurfacing/Removal of Existing, Roads, Trails and Parking Areas, 4 - Health and Safety Activities, 5 - Routine Grounds Maintenance, 7 - Hazardous Fuel and Fire Management, 10 - Erection of Signs, Wayside Exhibits, and Memorial Plaques Project Completed: Ongoing - PCE Category: Facilities Maintenance Superintendent Approval Date: 10/8/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 14 - Mechanical, Electrical and Plumbing Systems Project Completed: Ongoing Category: Facilities Maintenance Superintendent Approval Date: 10/8/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 4 - Health and Safety Activities, 5 - Routine Grounds Maintenance, 7 - Hazardous Fuel and Fire Management Project Completed: Yes - 10/16/24 Category: Facilities Maintenance Superintendent Approval Date: 10/8/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 1 - Preservation Maintenance and Repair of Historic Properties, 5 - Routine Grounds Maintenance Project Completed: Ongoing - PCE Category: Cultural Resource Management Superintendent Approval Date: 10/8/2024
Assessement of Affect: No Adverse Effect Documentation Method: Streamlined Review Streamline Review Activity: 4 - Health and Safety Activities, 14 - Mechanical, Electrical and Plumbing Systems Project Completed: Yes - 12/15/24 Category: Facilities Maintenance |