Contstruction Drawings for the Natural Bridges PV System

These drawings are the construction drawings for the Natural Bridges PV system. All files are TIF format sized between 400k and 800k.

The following files contain the electrical wiring schematics and other information pertinent to the construction and assembly of the PV system. The drawings are dated 3/1/80. The first drawing is an index drawing.

The following files include the site layout and the construction drawings for the various buildings utilized by the PV system. The drawings are dated 1/1/81. The first drawing is an index drawing.

0001
0002
0003
0004
0005
0006
0007
0008
0009
0010
0011
0012

Last updated: February 24, 2015

Park footer

Contact Info

Mailing Address:

HC-60 Box 1
Lake Powell, UT 84533-0001

Phone:

435 692-1234 x616

Contact Us