Predesign ___
All required deliverables submitted.
___
Consistent with DSC Occupational Health & Safety Engineering Design Standards.
___
Design Program aligns with PMIS (project management information system) and Budget.
___
Hazardous Materials Investigations/Recommendations
Schematic Design ___
All required deliverables submitted.
___
Consistent with DSC Occupational Health & Safety Engineering Design Standards.
___
Design narrative includes descriptions of all proposed life safety systems.
___
Confined Spaces and Hazards mitigated or eliminated.
Design Development (DBB or DB) ___
All required deliverables submitted.
___
Consistent with DSC Occupational Health & Safety Engineering Design Standards.
___
Outline specifications.
___
The design is in general accordance with Code of Federal Regulations (CFR) and Director's Orders/Reference Manuals (DO/RM): 29 CFR 1910, 29 CFR 1926, DO/RM 50B Occupational Safety and Health Program, and DO/RM 50C Public Risk Management Program.
___
Confined Spaces and Hazards mitigated or eliminated.
100% Draft Construction Documents (DBB) or 100% Draft Design-Build Construction Documents (DB) ___
All required deliverables submitted.
___
Consistent with DSC Occupational Health & Safety Engineering Design Standards.
___
Detailed specifications.
___
The design is in general accordance with 29 CFR 1910, 29 CFR 1926, DO/RM 50B Occupational Safety and Health Program, and DO/RM 50C Public Risk Management Program.
___
Confined Spaces and Hazards mitigated or eliminated.
100% Complete Construction Documents (DBB) or 100% Complete Design-Build Construction Documents (DB) ___
All required deliverables submitted.
___
Consistent with DSC Occupational Health & Safety Engineering Design Standards.
___
All review comments from 100% Draft Review satisfactorily resolved.
|