Evaluate alternative treatments by discipline.
2.1 Discuss and Analyze Ultimate Treatment and Use
- Discuss and analyze the ultimate treatment and use of the structure as defined in park planning documents.
- Present alternative approaches.
2.1.1 Civil
2.1.1.1 Provide Recommendations for Water System Components
- List recommendations for existing system repairs/rehabilitation.
- List recommendations for new water system components.
- List recommendations for further analysis, investigation.
2.1.1.2 Provide Recommendations for Wastewater System Components
- List recommendations for existing system repairs/rehabilitation.
- List recommendations for new wastewater system components.
- List recommendations for further analysis, investigation.
2.1.1.3 Provide Recommendations for Motor Vehicle Access and Pedestrian Access
- List recommendations for existing motor vehicle access and pedestrian access repairs/rehabilitation.
- List recommendations for new motor vehicle access and pedestrian access.
- List recommendations for further analysis, investigation.
2.1.2 Site
2.1.2.1 Provide Recommendations for Site Condition Improvements
- List recommendations for site drainage and storm sewer repairs, rehabilitation.
- List recommendations for new site drainage and storm sewer system components.
- List recommendations regarding site landscaping, vegetation and fencing.
- List recommendations for further analysis, investigation.
2.1.3 Architecture
2.1.3.1 Provide Recommendations Repair/Replacement of the following Damaged/Deteriorated Elements:
- existing materials
- new materials
- roofs
- additional insulation
- increasing slope
- raising flashing heights
- relocating or remounting rooftop equipment
- reconstructing or adding expansion joints
- changing roof materials
- adding more primary drains or scuppers
- adding overflow drains and scuppers
- repair or replacement of roof
- for accessibility
2.1.3.2 Provide Recommendations for Further Investigation/Analysis
2.1.4 Structural
2.1.4.1 Provide Recommendations for:
- the discussion of applicable codes (IEBC, IBC, NFPA, ASC 7, ASCE 31)
- existing conditions
- repair/replacement of damaged/deteriorated elements
- load bearing analysis
- strengthening
- further investigation/analysis
2.1.5 Mechanical
2.1.5.1 Provide Recommended Treatments (Suitable Options for Each Mechanical System Should Be Listed Along With Pros and Cons for Each Option)
- Perform code analysis and requirements (including requirements specific to NPS, e.g., D.O. 58).
2.1.6 Electrical
2.1.6.1 Prepare Recommendations
- List recommendations for repair/replacement of electrical systems.
2.1.7 Safety
2.1.7.1 Prepare NPS RM 58 [Structural Fire] compliant Fire Safety Plan to address the unique fire and life safety issues. The Fire Safety Plan consists of the following elements:
- Introduction
- Design Team
- Applicable Codes
- Fire Protection/Life Safety Approach
- general description
- general fire resistive construction aspects
- occupancy classifications
- fire resistive separations
- doors and windows
- interior wall, ceiling and floor finishes
- decorative structures within buildings
- egress
- special design
- emergency signage
- suppression systems
- fire department access
- fire detection and alarm system
- emergency communication systems
- smoke management description
- central control station
- emergency and standby power
- elevators
- Acceptance Testing
- Periodic Operation and Maintenance
- Conclusion