• Pa-Hay-okee Overlook

    Everglades

    National Park Florida

SFNRC Final Deliverables

SFNRC Home >> Permits >> Final Deliverables
 

The investigator must submit to the Everglades and Dry Tortugas National Park Research Permit Coordinator all other deliverables listed in special condition 14 of the investigator’s permit, within 6 months of the expiration of the investigator’s permit. The following deliverables must be submitted:

  1. A comprehensive annual report (both hardcopy and electronic copy). See special condition 14 for comprehensive annual report format.
  2. A copy of all field notes.
  3. An electronic copy of data collected and metadata (see Research Data Reporting Requirements for more detailed information).
  4. A list of all specimens/material consumed through analysis, with coordinates of collection sites.
  5. Voucher specimens (submit specimens to the South Florida Collection Management Center).

Did You Know?