Construction Management Representative (CMR)
- Review Value Engineering Change Proposal (VECP) for the minimum information required in contract clause entitled “Value Engineering - Construction,” FAR 52.248-3.
- Notify Contracting Officer Representative (COR) that VECP has all required elements and forward information to COR.
- If essential elements are missing from proposal, draft rejection letter for COR signature.
Guidelines: