Update: Site Observation Update Week of Aug 11th and Aug 18th

August 26, 2020 Posted by: Ranger Jeff
Update: Site Observation Update Weeks Aug11th and Aug 18th

We have two weeks of updates for you, and progress has been significant with several major components of the site complete and nearing completion.

Of note, the new access road from Cattle Point Road continues to be prepared for pavement, and culvert for drainage has been installed. At the end of the old access road, a new cul-de-sac has been prepared and readied for pavement, while the remainder of the old access road pavement, and that in the old parking lot, has been removed in preparation for new. The final backfill has now been completed at the septic drainage site as well. Rounding out the major external work, siding on the south side of the building is complete and work now moves to the front of the structure, and the combination of the two siding types has turned out very well.

Inside, cedar window and door casings are nearing completion as door and window hardware are being installed as well. Additionally, Ranger workstations have been installed in the administrative area as has the visitor services desk in the main room. That work is a nice compliment to the bookstore cabinetry which is already in place. Work in the two restrooms has revealed a beautiful and bright combination of colors which are accented by the natural light from the skylights installed earlier. It’s really exciting to see all the finish work coming together as we get ever closer to completion.

It’s important to note that all crew members are employing all those health and safety measure that we are all practicing, including social distancing. Work crew members are being monitored regularly, and sanitation facilities are available for the crew. While the project is certainly important, the health and safety of employees and workers is much more important.

Visitor Service Desk being Assembled
(A) Here we see the main visitor desk cabinetry being installed. This woodwork compliments the cabinetry already installed in the bookstore area just to the right of this photo.
Ranger work table installed
(B) Inside the administrative area, this counter will host individual workstations for three rangers.
Door and window hardware installed
(C) In this example from the restroom r we see hardware installed on doors. The same style hardware will be installed on windows.
Installation of siding on south side
(D) On the south side of the building, we see the two siding types complimenting one another for a beautiful PNW affect.
New entry road at Cattle Point Road
(E) Here we see the new entry road, now further south from the old entry road. Work is now focused on finishing culvert installation and compacting in preparation for a base gravel layer followed by pavement.

(F) Yes, we will be installing walls around toilets. In the meantime, you will notice the bright white tile with blue accent bathed in the natural light from skylights. Counters of similar material are installed as have fixtures.

Restroom fixtures installed
(G) Here, at the entry of the old access road, workers have now cleared space for a cul-de-sac in preparation for pavement.
Workers finishing cul-de-sac at old entry road
(H) We are really pleased with the beautiful cedar trim work around doors and windows which tie openings to the rest of the interior and exterior structure.
Cedar trim around windows
(I) Here, up close, we see not only the drinking fountain installed, but also the horizontal cedar siding that compliments the board and batten siding elsewhere.
Drinking fountain and siding
(J) Back to the new access road, we see gravel being leveled in preparation for pavement.
Preparing new entry road for pavement
(K) Rounding out this two-week report, we see old pavement removed and to be hauled away and recycled. Here too new pavement will soon arrive.
Old pavement awaiting removal

 

Last updated: August 26, 2020