#11 Union Pacifics Last Cut

-
Union Pacific's Last Cut
Ironically, some of the most difficult work for the Union Pacific on their line from Nebraska to Utah was here in these mountains, only a few miles from the completion site. A tortuous ten miles of track, with an average climb of eighty feet per mile, was laid from the valley floor to the summit of the pass. Included in the construction were four long fills, four major trestles, five sizeable rock cuts, and numerous culverts.