Dinosaur
Historic Structure Report
Quarry Visitor Center
NPS Logo


TABLE OF CONTENTS


COVER (HTML)

EXECUTIVE SUMMARY (HTML)

ADMINISTRATIVE DATA (HTML)

PART 1. DEVELOPMENTAL HISTORY (PDF)

Chronology of Development and Use
Physical Description
Character Defining Features
Condition Assessments
Civil Condition Assessment
Site Condition Assessment
Architectural Condition Assessment
Structural Condition Assessment
Mechanical Condition Assessment
Electrical Condition Assessment

PART 2. TREATMENT AND USE (PDF)

Ultimate Treatment and Use
Requirements for Treatment
Civil Requirements for Treatment
Site Requirements for Treatment
Architectural Requirements for Treatment
Structural Requirements for Treatment
Mechanical Requirements for Treatment
Electrical Requirements for Treatment
Alternatives for Treatment
Civil Alternatives for Treatment
Architecture Alternatives for Treatment
Structural Alternatives for Treatment
Mechanical Alternatives for Treatment
Assessment of Effect for Recommended Treatment
Civil Assessment of Effect for Recommended Treatment
Site Assessment of Effect for Recommended Treatment
Architecture Assessment of Effect for Recommended Treatment
Structural Assessment of Effect for Recommended Treatment
Mechanical Assessment of Effect for Recommended Treatment
Electrical Assessment of Effect for Recommended Treatment

APPENDIX A. HISTORIC PHOTOGRAPHS (omitted from online edition)

APPENDIX B. EXISTING CONDITION PHOTOGRAPHS (omitted from online edition)

APPENDIX C. HISTORIC DRAWINGS (omitted from online edition)

APPENDIX D. EXISTING CONDITION/TREATMENT DRAWINGS (omitted from online edition)

APPENDIX F. HISTORIC DOCUMENTS (omitted from online edition)

APPENDIX G. NATIONAL REGISTER NOMINATION FORM (omitted from online edition)

APPENDIX H. PROJECT MANAGEMENT INFORMATION SYSTEM PMIS (omitted from online edition)

APPENDIX I. MATERIALS/PAINT ANALYSIS (omitted from online edition)

APPENDIX J. BIBLIOGRAPHY (omitted from online edition)


Division of Project Management
Ron Shields, Project Manager

Division of Facility Design and Construction
Bruce Keller, Job Captain/Structural Engineer
Geoffrey Yost, Architect
Larry Kilborn, Architect
Dave Snow, Historical Architect
Emma MŽndez Qui–ones, Electrical Engineer
Scott Thomas, Mechanical Engineer
Lynn Wegee, Mechanical Engineer
Jim Pazalos, Engineering Technician

Division of Planning and Site Design
Steve Bainbridge, Civil Engineer
Tom Thomas, Cultural Resource Specialist
Robert Ryan, Landscape Architect



http://www.nps.gov/dino/hsr1/hsrt.htm
Last Updated: 13-Jan-2004