[Narration] As you drive through the West Tunnel imagine the time and manpower it took to bore through 192 feet of mountain using 1926 technology. Dynamite and jackhammers were used by men working double and triple shifts tackling this monumental task in October of 1926. Finally, winter temperatures of 32 degrees below zero forced workers to stop working and come back in April of 1927 to finish the job.
Two interesting and impressive features of the tunnel are the observation windows that were created to offer spectacular views of Heavens Peak and the upper McDonald Creek Valley. A sidewalk lines the tunnel and allows access to the window ports within. Please use extra caution as you walk inside the tunnel, as drivers passing in vehicles may not be able to see well in the reduced light inside the tunnel.
As originally constructed, the tunnel was unlined and over time seeping water started to weaken the roof and bits of rock would occasionally fall onto the road bed and passing vehicles. Its current smooth inner lining was installed to prevent damage to passing cars and help stabilize the roof.
Description
Constructed between 1926-1927, this iconic spot features window ports that over look Heaven's Peak & the Upper McDonald Creek Valley.
Duration
1 minute, 21 seconds
Credit
Glacier National Park
Date Created
08/05/2015
Copyright and Usage Info