Article

Tri-Lakes Loop

Elevation profile for the Tri-Lakes Loop
Elevation profile for the Tri-Lakes Loop
.
Map of the Tri-Lakes Carriage Road Loop in Acadia National Park
Map with intersection numbers and bridge locations

Overview

Includes Eagle Lake, Bubble Pond, and Jordan Pond

Length: 10.9 miles

Traveling Intersection Numbers: 6-7-17-16-15-14-10-8-9-6

The Tri Lakes Loop crosses these carriage road bridges:
  • Eagle Lake Bridge (B)
  • Bubble Pond Bridge (D)
  • Triad-Day Mountain Bridge (M)
  • Jordan Pond Dam Bridge (K)
  • Deer Brook Bridge (E)

Experience and Expectations

The Tri Lakes Loop combines the Eagle Lake and Jordan Pond loops. The western side of the loop is marked by a high point at intersections 8 and 10N/10S, while the eastern side of the loop is much flatter.

On a manual bike, this loop is estimated to take around 1 hour and 15 minutes to 1 hour and 45 minutes.

Carriage Road Bridges

Loading results...

    Acadia National Park

    Last updated: September 10, 2025