Last updated: October 2, 2026
Article
Rehabilitation of the Second Bank Block
NPS
The landscape project is located directly south of the Second Bank of the United States, and bound by 4th and 5th Streets and Library and Walnut Streets.
Project Overview
The project will address the deficiencies within the landscape south of the Second Bank of the United States. This entails:
A new pathway will connect the existing plaza, where the statue is located, with the site's northeast corner to improve pedestrian flow. Various planting beds and areas of vegetation will also be established or restored to enhance the visitor experience.
The project will address the deficiencies within the landscape south of the Second Bank of the United States. This entails:
- replacing damaged walkways
- repairing brick walls
- improving site drainage
- resetting the based of the Robert Morris statue
A new pathway will connect the existing plaza, where the statue is located, with the site's northeast corner to improve pedestrian flow. Various planting beds and areas of vegetation will also be established or restored to enhance the visitor experience.
Timeline
The project will begin on (or around) October 13, 2026 and is expected to be completed fall of 2027.
The project will begin on (or around) October 13, 2026 and is expected to be completed fall of 2027.