Video
One Step Closer!
Description
On December 17th 2014 preservation specialists at Steamtown NHS conducted a test of the boiler on the Baldwin # 26. After the test was completed the throttle was opened allowing steam to clear the steam chest and then the boiler was blown down and the fire was dumped.
Duration
1 minute, 33 seconds
Credit
Dan Kahl
Date Created
12/17/2014
Copyright and Usage Info