Wetland and Creek Restoration at Big Lagoon

Note: This was formally known as Big Lagoon Wetland and Creek Restoration project.

The Wetland and Creek Restoration at Big Lagoon is a joint project of the National Park Service and the County of Marin, CA. The purpose of the project is to restore a functional, self-sustaining ecosystem, including wetland, riparian and aquatic components and to conduct the restoration in a manner that will re-create habitat for sustainable populations of special status species, reduce flooding on Pacific Way, and provide a compatible visitor experience. The project area is located at Muir Beach, the mouth of the Redwood Creek Watershed which is recognized for its local and regional importance. The project area includes 38 coastal acres encompassing the entire wetland, creek, and riparian area extending from just downstream of Highway 1 to the beach, including a small intermittent tidal lagoon at the beach. The project area is entirely within the boundary of the Golden Gate National Recreation Area of the National Park Service (NPS), but only half of the project site is owned by NPS. Other landowners are the San Francisco Zen Center, which operates Green Gulch Farm, and the County of Marin (County). This project aims to address the extensive loss of natural function for channel conveyance, sediment transport, channel stability, and diminished habitat for federally and state-listed endangered coho salmon and federally threatened steelhead; the increased flooding on Pacific Way; and the critical need for sustainable habitat for the CRLF. The project involves three components: (1) ecological restoration, (2) public access upgrades, including a reconfiguration of the existing parking lot, and (3) replacement of the Pacific Way Bridge. All components are designed to improve ecological function, while accommodating visitors and residents The County and NPS each play a unique role in the project. The County's role is limited to actions related to improvements to Pacific Way and the Pacific Way Bridge, with a joint role with NPS for interim flood reduction actions. All other actions are the responsibility of NPS. All components of the project are related and necessary to achieve the overall goals and objectives of the project; for this reason, they have been included as the whole of the project.

The FEIS/EIR was available for public review in February 2008. The Record of Decision was approved by the Pacific West Regional Director on November 26, 2008 and is available on this site under documents tab.
Contact Information:
Steve Ortega, Environmental Protection Specialist
(415) 561-2841
GOGA_planning@nps.gov

Tim Haddad, Environmental Coordinator
(415) 499-6269
THaddad@co.marin.ca.us
Links:
Documents:

Record of Decision Wetland and Creek Restoration at Big Lagoon Muir Beach Final EIS-EIR


Golden Gate National Recreation Area Superintendent Brian O'Neill announces the availability of the Record of Decision (ROD) for the Wetland and Creek Restoration at Big Lagoon, Muir Beach, CA. The ROD completes the National Environmental Policy Act (NEPA) compliance process for this important restoration project.

The project extends over 38 acres of land at Muir Beach owned by GGNRA, the San Francisco Zen Center and the County of Marin. A successful project will: Restore a functional wetland, riparian, and aquatic ecosystem; Improve habitat for special-status coho salmon, steelhead, and red-legged frog species; Reduce flooding on Pacific Way; and Enhance the experience for people visiting the area.

The ROD describes the selected action to be implemented, the decision rationale, and the mitigation measures that will be implemented to reduce project impacts. The ROD and general project information is available on the web at https://parkplanning.nps.gov/goga (click on the project title).

Please contact the GGNRA Planning office at (415) 561-2883 or goga_planning@nps.gov with any questions regarding this Record of Decision.

Wetland and Creek Restoration at Big Lagoon Muir Beach Final EIS-EIR

The Golden Gate National Recreation Area (GGNRA) and County of Marin have completed a Final Environmental Impact Statement/Environmental Impact Report (Final EIS/EIR) for Wetland and Creek Restoration at Big Lagoon, Muir Beach, Marin County, California. The EIS/EIR meets the requirements of the National Environmental Quality Act and the California Environmental Quality Act.
 

Last updated: February 28, 2015

Contact the Park

Mailing Address:

Golden Gate National Recreation Area
Building 201, Fort Mason

San Francisco, CA 94123-0022

Phone:

(415) 561-4700
Pacific West Region Information Center (415) 561-4700 Special Event & Commercial Film Permits (415) 561-4300

Contact Us