Finding of No Significant Impact

Letter to the Superintendent

Purpose and Need
Selected Alternative (Proposed Action) and Alternatives Considered or Analyzed
   Alternative 1: No Action
   Alternative 2
      Curry Village
      Amphitheater at Clark's Bridge
      Campground-Serving Facilities
      Campgrounds
   Selected Alternative: Alternative 3
      Curry Village
      Amphitheater at Clark's Bridge
      Campground-Serving Facilities
      Campgrounds
   Alternatives Considered But Dismissed
      Curry Village
      Campgrounds
Environmentally Preferred Alternative
Why the Preferred Alternative Will Not Have a Significant Effect on the Human Environment
Non-Impairment of Park Resources
Wild and Scenic Rivers Act
Mitigation
Public Involvement and Coordination
   Public Involvement
      Scoping History
      Public Comment
   Coordination
      U.S. Army Corps of Engineers
      Central Valley Regional Water Quality Control Board
      U.S. Fish and Wildlife Service
      California State Historic Preservation Officer
Native American Consultation
Conclusion

Wetland Statement of Findings for the Curry Village and East Yosemite Valley Campground Improvements Project

Purpose of this Statement of Findings
Affected Wetlands
   Wetland Extent
   Wetland Characteristics
   Existing Structures in Wetlands
Environmental Consequences of the Proposed Action on Wetlands
   Analysis
      Curry Village
      Campground Check Station and Recreational Vehicle Dump Station
      South Camp
      Upper Pines Campground
      Lower Pines Campground
   Cumulative Impacts
      Conclusions
   Alternatives Considered
      Alternative 1: No Action
      Alternative 2
      Alternative 3 (Preferred)
   Design or Modifications to Minimize Harm To Wetlands
      Construction Mitigation Measures and Resource-Specific Mitigation Measures
   Sustainable Design and Aesthetics
      Construction Mitigation Measures
   Resource-Specific Mitigation Measures
      Soils
      Hydrology and Water Quality
      Wetlands
      Vegetation
   Justification
      Nonwetland Alternatives to the Proposed Action
   Conclusion

Floodplain Statement of Findings for the Curry Village and East Yosemite Valley Campground Improvements Project

Introduction
Floodplain Extent
The Proposed Action
      Proposed Structures in the Floodplain
      Proposed Actions
      General Characteristics of Flooding in the Area
      Justification for Use of the Floodplain
      Description of Site-Specific Flood Risk
      Design or Modifications to Minimize Harm to Floodplain Values or Risks to Life and Property
Conclusion

Environmental Assessment Errata and Response to Substantive Comments
Errata Part 1 - EA Text Corrections, Additions and Clarifications
Errata Part 2 – Summary of Public Concerns and Responses
Introduction
How to Use This Document
Public Comments and Responses
Planning Process and Policy
Alternatives
Affected Environment

List of Tables

Table 1-1 Mitigation Matrix

List of Figures

Figure E-1 Delineation of Waters of the United States, Incuding Wetlands, Campground Expansion Area
Figure E-2 Delineation of Waters of the United States, Incuding Wetlands, Campground Expansion Area
Figure E-3 Delineation of Waters of the United States, Incuding Wetlands, Curry Village Area
Figure F-1 Flood Plain
Figure II-8 South Camp Alternative 2
Figure II-9 Upper Pines Campground Alternative 2
Figure II-10 Lower Pines Campground Alternative 2
Figure II-17 South Camp Alternative 3
Figure II-18 Upper Pines Campground Alternative 3
Figure II-19 Lower Pines Campground Alternative 3
Figure III-1 Project Area
Figure III-3a Jurisdictional Wetlands
Figure III-5 NPS Scenic Rating Classification

 


Finding of No Significant Impact (main) - Letter from the Superintendent - Finding of No Significant Impact (table of contents) -
Finding of No Significant Impact (document) -
Wetland Statement of Findings - Floodplain Statement of Findings - Environmental
Assessment Errata and Response to Substantive Comments

Yosemite Home . Yosemite Planning Page