• Rainbow over Half Dome

    Yosemite

    National Park California

There are park alerts in effect.
hide Alerts »
  • Road Closures Due to El Portal Fire

    The Big Oak Flat Road between Crane Flat and the El Portal Road is temporarily closed. There is no access to Yosemite Valley via the Big Oak Flat Road or Highway 120. Tioga Road is open and accessible via Big Oak Flat and Tioga Pass Entrances. More »

  • Campground Closures Due to Fire

    Crane Flat, Bridalveil Creek, and Yosemite Creek Campgrounds are temporarily closed. More »

  • Yosemite National Park is Open

    Yosemite Valley, Glacier Point, and Wawona/Mariposa Grove areas are open and accessible via Highways 140 and 41. Tioga Road is not accessible via Highways 140 and 41 due to a fire.

Merced River Plan ~ archive

MRP Home

Public Meetings

Archive

Documents Research

Comment




JANUARY 2013 DRAFT PLAN: Read about the draft plan and download it
SUMMARY GUIDE: Read a 20-page digest with an inserted 2-page matrix

Previously completed Merced River Plans


The National Park Service prepared the initial Merced Wild and Scenic River Plan (MRP) in August 2000. After multiple lawsuits and litigations on March 27, 2008, the U.S. Court of Appeals for the Ninth Circuit issued an opinion expanding the scope of what the NPS had previously understoond must be included in a legally valid Merced Wild and Scenic River Comprehensive Management Plan.

2000

Merced Wild and Scenic River Comprehensive Management Plan
[10 MB PDF]




June
2005

Merced Wild and Scenic River Revised Comprehensive Management Plan and Supplemental Environmental Impact Statement
(broken into sections below)

Coverletter from Superintendent [92 kb PDF]
Abstract [38 kb PDF]

PART 1-Title Page [384 kb PDF]
How Document Changed [52 kb PDF]
Table of Contents [60 kb PDF]
Executive Summary [701 kb PDF]
Chapter I-Purpose and Need [1.4 MB PDF]
Chapter II-User Capacity Management Program [1.6 MB PDF]
Chapter III-Alternatives [6.4 MB PDF]
Chapter IV-Affected Environment [1.1 MB PDF]

PART 2-Title Page [384 kb PDF]
Chapter V-Environmental Consequences [2.3 MB PDF]
Chapter VI-Consultation [90 kb PDF]
Chapter VII-List of Preparers [49 kb PDF]
Chapter VIII-Glossary [147 kb PDF]
Chapter IX-Bibliography [191 kb PDF]
Appendix A-Governing Mandates [88 kb PDF]
Appendix B-Mitigation Measures [63 kb PDF]
Appendix C-Assumptions [104 kb PDF]
Appendix D-Special Status Species [183 kb PDF]
Appendix E-Cumulative Actions [146 kb PDF]
Appendix F-Responses to Public [1.1 MB PDF]

2005 Record of Decision [413 kb PDF]

For a CD of the 2000 or 2005 plans, contact us.

































Additional Document Archive: View current public documents related to the January 2013 Merced Wild and Scenic River Draft Comprehensive Management Plan and Environmental Impact Statement. Find 2011 and older documents on a separate webpage.

Did You Know?

Low intensity fire in Yosemite

Natural fires in Yosemite are often no more than a single burning snag (standing dead tree) or a slow moving, low intensity fire that cleans underbrush from the forest floor. These fires prevent unwanted fires by removing accumulating forest debris that can fuel a larger fire in hot, dry conditions.