• A curve along the Natchez Trace Parkway with fall colors

    Natchez Trace

    Parkway AL,MS,TN

  • Parkway Detour in effect near Ridgeland

    An 8-mile section of the Parkway will be closed to vehicular traffic on March 14, 2012, due to a major safety hazard that has developed near milepost 94.8 between Ridgeland, MS, and Clinton, MS.

Wildlife

Did You Know?

Double arch bridge at mile post 438 on the Natchez Trace Parkway

The double arch bridge at milepost 438 on the Natchez Trace Parkway was completed in 1994 and received the Presidential Award for Design Excellence in 1995 for its innovative design.  The bridge rises 155 feet above the valley and eliminates the need for spandrel columns.