August 15, 2002

Today's Accomplishments:

Continued work on the top of the mound. The south side was closed today.

Possible gray platform fill in N51 E191 floor on top of the mound. Possible gray platform fill in N51 E191 floor on top of the mound. The floor is at 310 cm, which is about 1.5 meters below the surface, and about as deep as we will be going into the mound summit this season. It has still meant a vast amount of fill removed, ca. 100 cubic meters from this area of the site alone.

N57 E181-182, Feature 85. A small probable hearth at the north side of the mound summit.

N57 E181-182, Feature 85. A small probable hearth at the north side of the mound summit. Photograph by Charles Lawson, who took over photography duties while Dave Anderson was traveling back from SEAC today.