Continued work on the top of the mound. The south side was closed
today. |
 |
Possible gray platform fill in N51 E191 floor on
top of the mound. The floor is at 310 cm, which is about 1.5 meters below
the surface, and about as deep as we will be going into the mound summit
this season. It has still meant a vast amount of fill removed, ca. 100 cubic
meters from this area of the site alone. |
|
|
 |
N57 E181-182, Feature 85. A small probable hearth
at the north side of the mound summit. Photograph by Charles Lawson, who
took over photography duties while Dave Anderson was traveling back from
SEAC today. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|