|
|
 |
John Cornelison takes a moment
to update his notes on the project |
 |
The Flote-Tech Model A1 arrived
on August 13, 2001 |
 |
Ariana Slemmens reading the
manual for the Flote-Tech machine. August 13, 2001 |
 |
Bailing water out of the south
step trench. August 10, 2001 |
 |
Rachel Horlings carefully excavates
a feature in the south step trench. August 6, 2001 |
 |
Structure at the base of Mound
A. July 31, 2001 |
 |
Under the boardwalk: Jessica
McNeil working on the northernmost unit on the top of Mound A. This
boardwalk connects to the north side staircase. July 30, 2001 |
 |
Ariana Slemmens working on
the FS Log near the end of the day. Ariana spends the last 30 minutes
sorting and assigning the artifacts from that day a Field Specimen number.
July 30, 2001 |
 |
Rachel Horlings excavating
in the top unit of the step trench. July 28, 2001 |
 |
Rachel Horlings and Chene Williams
checking elevations on the step trench to the south of Mound A. July
25, 2001 |
 |
Caution: Excavations on top
of Mound A are sectioned off by caution tape to keep the workers from
getting too close to the edge. July 24, 2001 |
 |
Tammy Cooper and Liz Driscoll
documenting the post holes dug for the new railing along the top of
Mound A. July 24, 2001 |
 |
Sudha Shah excavating in the
step trench. July 23, 2001 |
 |
Emily M. Yates photographing
the excavations to the west of Mound A with the help of Rachel Horlings
and Phillip Knecht. July 20, 2001 |
 |
Tammy Cooper and John Cornelison
discussing excavations while screening. July 19, 2001 |
 |
Chuck Lawson documenting excavations
in the step trench. July 19, 2001 |
 |
Time to go! Retrieving the
core machine from the pond. July 18, 2001 |