| Today's Goals: |
Continue work on the north side
of Mound A and across the top of the mound. Begin processing flotation samples
at the on-site lab. |
 |
Every step in the north step trench
is now open. |
 |
Two units in the middle of the top
trench are being excavated further for the next building stage of the mound. |
 |
Jessica McNeil "waterscreening"
with the mister - the last level of the day was rather difficult to move
through the screen and the water helped to clean away the dirt. |
 |
Monte Abbott getting his hands a
little wet in the flotation machine. Monte worked at the lab all day processing
samples. |
 |
The result: a heavy screen sample
(drying on racks) and a light fraction sample (hanging to dry). |