August 13, 2001

Today's Goals: Continue work on the north side of Mound A and across the top of the mound. We are back to 11 regular workers plus our loyal Daughters of Union Veterans volunteers today.

The Flote-Tech Model A1 flotation machine arrived just after lunch today.

North side excavations continuing.  North side excavations continuing. North side excavations continued today, both in the trench and around the base of the mound.
The Flote-Tech Model A1 arriving. The Flote-Tech Model A1 arrived via semi-truck at the on-site lab just after lunch today.
Moving the Flote-Tech.  Moving the Flote-Tech.  Moving the Flote-Tech. Without a lift or a forklift, moving the 350lb. machine was a challenge! Maintenance came to our rescue.
The new flotation machine. The new flotation machine.