| Problem
The four original elevators performed poorly with respect to both travel and response time. In 1903, less than ten years after the building's construction, the original Sprague electric system was replaced with the Standard Plunger hydraulic system. Although this conversion required little change to the decorative elevator enclosure, subsequent alterations had major impacts. Between 1954 and 1962, the main stair and elevators were fully enclosed and fire-rated sheet rock was placed over the first floor glazed partitions. In 1962, the elevators were again replaced, apparently in response to code requirements and leakage at the seals of the water-based hydraulic system that sprayed water on those waiting for the elevator at each floor. The 1962 changes had a major impact on Sullivan's original design. The four 1903 cabs were replaced with a 3-cab, electrically powered system, with the remaining shaft left vacant for future use. The glazed elevator cabs were replaced with fully enclosed ones, and the open elevator shaft and single stairway were enclosed with two-hour, fire-rated masonry walls (see figure 3). Throughout the building, almost all elevator ornament was re moved, leaving only a small piece of the elevator framework exposed within the stair to the west of the elevator bank. Window openings within the elevator shaft were infilled with concrete block, and the shaft's skylight was removed to provide space for a new elevator penthouse. Subsequent changes and damage to the building occurred as a result of a fire and the lack of a general and consistent maintenance program. The loss of major tenants in the 1970s gave rise to efforts to demolish the building, fortunately thwarted by the sale of the building in 1981. The new owners embarked upon a project to rehabilitate the Landmark building for its original office and commercial use. Since the project was to receive a federal UDAG grant and take advantage of the federal tax incentives allowed for the rehabilitation of historic properties, review and approval by the State Historic Preservation Office, Advisory Council for Historic Preservation, and National Park Service were required. By 1981, building and fire codes had introduced standards of safety far beyond those in existence in either the 1890s or the 1960s. An exact restoration of the 1897 elevator would not have met the City of Buffalo's fire, egress or handicapped accessibility requirements. In case of fire, the glazed elevator cab and non-fire rated shaft would allow the spread of flames, smoke and noxious gases through the building. The lack of either a mechanical ventilation or smoke control system within the shaft prevented smoke and gases from being vented to the outside, and building occupants and fire fighters from moving safely through the building. Further, glazing inserted in the elevator cabs and shaft-way windows could explode from the heat causing injury or damage to building occupants, pedestrians, or adjacent buildings. Reconstruction of the original elevator controls (designed to be operated by elevator attendants) would have made it difficult for those with limited mobility or dexterity to use. Reconstruction would not have allowed installation of safety mechanisms to prevent injuries such as those caused by the impact of closing elevator doors or by catching fingers in pierced elevator grilles. |
|
![]() |
![]() |
|
Figure 3.First floor elevator lobby as restored,
1984, showing the replicated cast ornament on the elevator enclosure,
with sprinkler heads discreetly placed to protect elevator cabs. The elevator
door |
Figure 4. First floor elevator lobby, c. 1962. Modifications included reduction in number of elevators and addition of masonry enclosure around open elevators and main building stair. Photo, Cannon |
| Solution
For reasons of safety, operation, and budget, as many elements of the existing elevator system as possible were reused, and the elevator enclosures were restored only at the first and second floors. This approach had to be integrated into the overall goal of restoring Louis Sullivan's original design in the primary interior spaces and on the entire exterior, while creating a first-class, efficient, speculative office floor plan. The solution also had to meet or exceed current code requirements, and fit within a project budget that included other highly specialized restoration work on the art glass skylights and marble flooring and friezes. Historic Research and Physical Evidence Recreation of the spirit and overall appearance of Sullivan's design required extensive research of historical records and physical evidence contained within the building. Although original drawings of the elevator enclosure were never located, historical photographs and documents in the possession of a previous building owner proved to be invaluable. These records were an essential complement to the actual architectural fragments discovered in the building: a decorative column on each floor left exposed when the stairway was enclosed in the 1960's, structural and cornice elements, sections of grille, and one of the original medallions. |
|
Rehabilitation of Elevator Cabs The decision to reuse the existing elevator cabs, in concert with the fire-rated shaft and penthouse equipment introduced in the 1960s, limited the degree to which the building's original transparency and day- lighting scheme could be recaptured. The cab interiors were refurbished, however, and the 1960s hardware and laminate finishes were replaced with more compatible raised mahogany panels. |
|
Rehabilitation and Restoration of Elevator Enclosures At the first and second floor levels the elevator enclosures and original lobby floor plans were restored (see figure 4). Replication of all elements comprising the enclosures required the recasting of new elements in molds taken from original samples. Cast iron was used (as had originally been specified by Sullivan), and throughout the casting and finishing processes the architects worked closely with the artisans at the foundry. Only a few surviving elements were able to be refinished and reused. Some modifications to the original design were necessary for a variety of safety and operational reasons. For example, to allow for proper registration between the replicated enclosures and the reused cab doors (fixed with respect to location and dimensions), small cast iron spacers were discreetly added to the enclosure assembly. At all locations where the cast metal elevator enclosures was fixed, 1/4" wire glass was installed on the shaftway side with a specially designed, concealed glass gasket. The portion of the enclosure that opened with the elevator doors was double faced with wire glass installed on the lobby side as added protection (see figure 5) . Although the entire building retrofitted with sprinklers, double coverage was used at the elevator and first floor where glazing was installed or retained in lieu of solid fire-rated walls (2 hours). Sprinkler heads were located 6' on center (o.c.), selected and located to minimize their impact on the elevator enclosure. At the elevator shaft, two heads were placed at each 6' o.c. location, one directed upwards to protect the glazing above and the other directed horizontally to protect the lobby area below. Sprinkler heads were connected to piping located in the elevator shaft. To ensure an unobtrusive installation, sprinklers and piping on the lobby side of the enclosure were finished to match the decorative metal; piping within the shaft was painted black to match the shaftway walls.
|
|
Overall Safety Plan In 1981, the City of Buffalo still used its own code, the Buffalo Building Code, 1979 edition. Early consultation with the city code official and fire marshall revealed significant code compliance issues concerning the open elevator and the building's single stair. Successful resolution was reached in part due to the involvement of the code official, fire marshall, and architect from the State Historic Preservation office from the earliest stages of architectural planning through to project completion. With respect to code and safety Issues, this relationship proved essential, since the solution for the elevator enclosure evolved as a part of the overall safety plan for the building. The acceptance of the wire glass and sprinkler solution as an alternative to fire-rated walls around the elevator enclosure and stairway followed the approval of a similar scheme for the restoration of a nearby historic building that contained glazed doors and transoms in corridors adjacent to a large open atrium. As had been the case with that structure, the rehabilitation of the Guaranty included an improved exiting design for the entire building. New stairs exiting directly to the outside were unobtrusively added at the southeast and southwest corners of the building (see figure 6). The stairs at the southwest connected to the building's original open stair; at the south wall of the open stair's intermediary landing between the second and third floor, a fire separation and door to a new half-flight of stairs were added. This half-flight was considered part of the new fire-rated corridor that led directly to the southwest exit stair. Other fire safety elements added to the building included a fire detection annunciator and alarm system, standpipes, and a sprinkler system throughout the building. |
![]() |
|
Figure 5. The reconstruction of the elevator enclosures was a complex integration of code-required features (marked by an *) and architectural elements. Wire glass and double-coverage fire sprinklers replaced fire-rated walls while retaining the quality of light in Sullivan's original design. The metal ornament was reproduced in copper-plated cast iron and finished with a tinted varnish to match the original bronze electroplated finish . Drawing: Kaye Ellen Simonson
|