• Many Glacier Hotel at Glacier National Park, Montana

    DSC Workflows

Safety/Fire Protection QA Checklist

Predesign

___
All required deliverables submitted.
___
Consistent with DSC Safety/Fire Protection Design Standards.
___
Design Program aligns with PMIS and Budget.
___
Existing Utilities (Pressure, Flow, and Capacity).
___
Hazardous Materials Investigations/Recommendations

Schematic Design

___
All required deliverables submitted.
___
Consistent with DSC Safety/Fire Protection Design Standards.
___
Design narrative includes descriptions of all proposed fire protection and life safety systems.
___
Confined Spaces and Hazards mitigated or eliminated.
___
Outline Code Analysis based on NFPA 1 (Fire Code), NFPA 101 (Life Safety Code), I codes and other applicable NFPA Codes and Standards. The Code Analysis shall include, but not be limited to, the following elements:
  • General Description of the Project
  • General Fire Resistive Construction Aspects
  • Occupancy Classifications
  • Fire Resistive Separations
  • Doors and Windows
  • Interior Wall, Ceiling and Floor Finishes
  • Decorative Structures within Buildings
  • Egress
  • Special Design
  • Emergency Signage
  • Suppression Systems
  • Fire Department Access
  • Fire Detection and Alarm System
  • Emergency Communication Systems
  • Smoke Management Description
  • Central Control Station
  • Emergency and Standby Power
  • Elevators

Design Development (DBB) or DB)

___
All required deliverables submitted,
___
Consistent with DSC Safety/Fire Protection Design Standards,
___
Outline specifications.
___
The design is in general accordance with 29 CFR 1910, DO/RM 50B "Occupational Safety and Health", DO/RM 50C "Public Risk Management" and/or DO/RM 58 "Structural Fire".
___
Confined Spaces and Hazards mitigated or eliminated.
___
Conforms to the Detailed Code Analysis.

100% Draft Construction Documents (DBB) or 100% Draft Design-Build Construction Documents (DB)

___
All required deliverables submitted.
___
Consistent with DSC Safety/Fire Protection Design Standards.
___
Detailed Specifications
___
The design is in general accordance with 29 CFR 1910, DO/RM 50B "Occupational Safety and Health", DO/RM 50C "Public Risk Management" and/or DO/RM 58 "Structural Fire".
___
Confined Spaces and Hazards mitigated or eliminated.
___
Drawings demonstrate a design in general accordance with the Code Analysis.

100% Complete Construction Documents (DBB) or 100% Complete Design-Build Construction Documents (DB)

___
All required deliverables submitted.
___
Consistent with DSC Safety/Fire Protection Design Standards.
___
All review comments from 100% Draft Review satisfactorily resolved.