Quarry Visitor Center–The exterior framers have finished the majority of their work and most of the interior framing is also complete.

The new pedestrian bridge, connecting the parking lot and visitor center, was set this week. This is a bridge with an interesting history: it used to be a railcar! This recycled railcar is one of the sustainable features/green technologies that will be factored into the LEED (Leadership in Energy and Environmental Design) certification for the new visitor center.

There's more work to be done on the bridge/recycled railcar--including paving and stonework--but the wing walls, retaining walls, and abutments are all done and the earthwork contractors have backfilled at the abutments.
The rough mechanical contractors have been on-site to lay out the vents and other locations where mechanical parts will penetrate the walls.

It’s time to think about paint colors, but we’re waiting to receive the sheet metal samples before finalizing color choices. The bridge will be a terra cotta color, and other exposed metal will be dark beige. The underside of the space frame in the exterior seating area will be a lighter color to reflect the light and brighten up the area.

 
Newly installed bridge leading from parking lot to visitor center.
The newly installed pedestrian bridge.
 
View of grid work.

View of the grid work at the Quarry Exhibit Hall, seen from what will eventually be the interior of the building.

Quarry Exhibit Hall–Concrete work for the new foundation continues. On one of the grids, the grade beam reinforcement was located roughly an inch or two too low because of over-excavation and placement of the rebar; additional #4 bars were added to the top of the pour to remedy to remedy the situation. The contractor is ensuring that excavation is to grade and correct rebar placement in the remaining grids.

Lead paint abatement continues, but is slow going, and the structural steel installation has to wait on the lead abatement.

Desert rose paint will be used for the exhibit hall.

 
Man doing lead paint abatement work.
Work continues on lead paint abatement at the Quarry Exhibit Hall.
 
View of the Quarry Visitor Center under construction.

A view of the Quarry Visitor Center in mid-September.


September 7-21, 2010

Quarry Visitor Center – The rough electrical work continued with in-wall and in-ceiling lines being run, and conduit and boxes hung. The rough plumbing installation began and the site for the fire hydrant was located. The rough mechanical work resumed.

The structural steel work is almost complete. The canopy frame and shade structure on the south end of the building should be done soon. Framing of the roof joists and sheathing over the building addition is complete. The restroom walls and most other interior walls have been framed.

 
Most of the interior walls at the Quarry Visitor Center have been framed.
Most of the interior walls at the Quarry Visitor Center have been framed.
 
Shoring a column during construction at the Quarry Exhibit Hall.

Column shoring at the Quarry Exhibit Hall.

Quarry Exhibit HallThe shoring frames have been installed on several of the grids. Footing demolition is complete. The re-grading along the north/top site of the building is nearly complete.

 

Read about the history of the Quarry Exhibit Hall or click on the links below for earlier Construction Updates:

March 2010 April 2010 May 2010
June 2010 July 2010 August 2010

Construction Update Main Page

Did You Know?

Raft going through rapids.

Whitewater rafting is a popular way to experience the remote canyon areas at Dinosaur National Monument. You can take a licensed commercial rafting trip or you can tackle the river on your own, provided you have a permit, the correct equipment and the necessary experience.