|
|
|
|
SECTION 106 COMPLIANCE
Field Projects FY97
- BOWA
- Replacement of Accessibility Trail
- COLO
- Reed St. Wastewater Lift Station Monitoring
- DEWA
- Multiple Use Trail (11 miles)
- EDAP
- Replacement of S Reed St. wastewater lift station monitoring
- FONE
- Maintenance area water line and well testing
- FRSP
- Install interpretive trail, wayside and vegetative Buffers Chancellors. NB testing
Install interpretive trail, wayside at Wilderness NB testing
Chatham wayside testing
- GETT
- Bigg's Ho. cable installation monitoring
GPU electric line on Lefever St. monitoring
Jones Battalion drainage testing
Earl Broomhead salvage testing
Redding garage testing
Redding complex monitoring
Redding lightening protection monitoring
ELSE fire suppression testing
Sewer line testing at Hoffman Ho. and at ELSE farm 2
Longstreet s Monument testing
Longstreet s Monument monitoring
Federal Hwys Monitoring ph. 1
Electric line Rt. 15 monitoring ph 2
ELSE chiller unit installation monitoring
Spangler s field water valve replacement monitoring
Horse trail replacement over Roger's site
East Cay, field Ag. tiles replacement -2 farms
- GEWA
- Memorial House Accessibility testing
Water system drain lines testing
Relocate frame shed monitoring
Sewer pump line testing
Bull pen post holes monitoring
Bull pen ramp monitoring
Traffic counter installation testing
- HAMP
- Install poles for electric line monitoring
- INDE
- Graff House Steam Line monitoring
- MAWA
- Reconstruction of Porches testing
- NERI
- Improvements at Grandview Sandbar and Army Camp testing
- VAFO
- Yellow Springs Road repairs testing
New Sign Proj. # 96005 monitoring
Phase I Landscape Rehab Arch monitoring
Knox-Tindle House monitoring
Arch testing
|