• Visitors enjoying a stroll along Canaveral National Seashore's pristine beach

    Canaveral

    National Seashore Florida

There are park alerts in effect.
show Alerts »
  • Haulover Canal Bridge Closure

    The Haulover Canal Bridge will be closed for construction beginning May 6, 2013. The bridge will be closed to all traffic for about 7 weeks. Access to the facilities on the north and south sides of the bridge will be open and unaffected.

Contact Public Affairs

Media inquiries should be directed to the park's Public Information Officer, Edwin Correa, via telephone (386) 428-3384 ext 237, or e-mail.

Did You Know?

Sea turtle hatchlings making their way back to the sea

That temperature determines the sex of sea turtle hatchlings? Females are hatched in the top, or warmer part of the nest, and males in the lower, or cooler part.