Yosemite National Park - National Park Service, United States Department of the Interior

Top left round

Main | Superintendent's Letter | Abstract | Executive Summary | Table of Contents | Chapter 1 | Chapter 2 | Chapter 3
Chapter 4 | Chapter 5 | Chapter 6
| Chapter 7 | Chapter 8 | Chapter 9 |
Tables | Figures | Appendices

Top right round

 
   
 

Table of Contents
____________________________________________________________________________________________________________

Superintendent's Letter

Abstract

____________________________________________________________________________________________________________

Executive Summary

Introduction
Purpose Of and Need For the Project
Relationship to Other Plans
Overview of the Alternatives
Environmentally Preferable Alternatives

Chapter 1 Purpose and Need

Project Background
Purpose Of and Need For the Project
Planning Context
Management Goals
Issues and Concerns
Organization of this Environmental Assessment

Chapter 2 Alternatives

Introduction
Overview of the Alternatives

   Alternative 1: No Action
   Alternative 2:
East Yosemite Valley Utilities Improvement Plan with Merced River Crossing at Housekeeping Camp (Preferred Alternative)
   Alternative 3:
East Yosemite Valley Utilities Improvement Plan with Merced River Crossing near Sentinel Bridge
   Actions Common to All Action Alternatives
Alternatives Considered but Dismissed
  
Expand Existing Utility Infrastructure to New Development Areas
  
East Yosemite Valley Utilities Improvement Plan with Superintendent’s Bridge Crossing
  
Elevated River Crossing at Sentinel Bridge
  
Tecoya Residences Alternative Alignment
   Tenaya Creek Alternative Alignment
   Residence One Alternative Alignment

Mitigation Measures Common to All Action Alternatives
  
Construction Mitigation Measures
  
Resource-Specific Mitigation Measures
  
Floodplains
   Wetlands
   Cultural Resources
   Vegetation (including Special-Status Species)
   Wildlife
   Special-Status Birds
   Special-Status Aquatic Species
   Special-Status Bats
   Scenic Resources
Comparison of Alternatives
   Summary of Environmental Consequences

Environmentally Preferable Alternative

Chapter 3 Affected Environment

Introduction
  
Resource Topics Considered in this Environmental Assessment
  
Impact Topics Dismissed From Further Analysis
Regional Setting
Local
Setting – East Yosemite Valley Utilities Improvement Plan Area
Natural Resources

  
Soils
  
Hydrology, Floodplains, and Water Quality
  
Wetlands
   Vegetation
   Wildlife
   Special-Status Species
   Air Quality
   Noise
Cultural Resources
  
Overview of Human Occupation
  
Archeological Resources
  
Traditional Cultural Resources
  
Cultural Landscape Resources, Including Historic Sites and Structures
Social Resources
  
Scenic Resources
  
Recreation
  
Park Operations and Facilities
  
Socioeconomics

Chapter 4 Environmental Consequences

Introduction
  
Impact Analysis
  
Cumulative Impacts
  
Impairment
Methods and Assumptions
  
Soils
  
Water Resources
  
Wetlands
  
Vegetation
  
Wildlife
   Special-Status Species
   Air Quality
   Noise
   Cultural Resources
   Scenic Resources
   Visitor Experience and Recreation
   Park Operations and Facilities
   Social and Economic Environment
Alternative 1: No Action
   Natural Resources
   Cultural Resources
   Social Resources
Alternative 2: East Yosemite Valley Utilities Improvement Plan with Merced River Crossing at Housekeeping Camp
   Natural Resources
   Cultural Resources
   Social Resources
Alternative 3: East Yosemite Valley Utilities Improvement Plan with Merced River Crossing near Sentinel Bridge
   Natural Resources
   Cultural Resources
   Social Resources

Chapter 5 Merced Wild and Scenic River

Introduction
Consistency with Management Elements of the Merced River Plan

Chapter 6 Consultation and Coordination

Project Scoping History
Agency Consultation
Future Information
List of Agencies, Organizations, and Businesses that Received the East Yosemite Valley Utilities
Improvement Plan Environmental Assessment

Chapter 7 List of Preparers and Reviewers

Chapter 8 Glossary

Glossary of Terms
Acronyms

Chapter 9 Bibliography

Tables

Table II-1:     Summary Comparison of Key Features of the Alternatives
Table II-2:     Summary of Environmental Consequences
Table III-1:    Yosemite Valley Soil Types
Table III-2:    Classification Criteria for Scenic Category 
Table III-3:    Population by County
Table III-4:    2000 Employment by Major Industry Sector
Table III-5:    2000 Economic Output by County and Industry Sector (in Millions of 2000 Dollars)
Table III-6:    2000 Total Taxable Retail Sales by County (in Millions of 2000 Dollars)
Table IV-1:    Soil Impact Intensity Definitions
Table IV-2:    Floodplain Impact Intensity Definitions
Table IV-3:    Soil Impacts Associated with Alternative 1
Table IV-4:    Wetland and Aquatic Habitats Potentially Affected by Alternative 1
Table IV-5:    Vegetation Community Types Potentially Affected by Alternative 1
Table IV-6:    Typical Noise Levels from Construction Equipment
Table IV-7:    Soil Impacts Associated with Alternative 2
Table IV-8:    Wetland and Aquatic Habitats Potentially Affected by Alternative 2
Table IV-9:    Vegetation Community Types Potentially Affected by Alternative 2
Table IV-10:  Soil Impacts Associated with Alternative 3
Table IV-11:  Wetland and Aquatic Habitats Potentially Affected by Alternative 3
Table IV-12:  Vegetation Community Types Potentially Affected by Alternative 3

Figures

Figure I-1:     Project Location Map
Figure II-1:    Key Map to Project Subareas
Figure II-2:    Existing Utility Lines, Happy Isles (Subarea 1)
Figure II-3:    Existing Utility Lines, Campgrounds (Subarea 2)
Figure II-4:    Existing Utility Lines, Ecological Restoration (Subarea 3)
Figure II-5:    Existing Utility Lines, The Ahwahnee (Subarea 4)
Figure II-6:    Existing Utility Lines, Curry Village (Subarea 5)
Figure II-7:    Existing Utility Lines, Housekeeping (Subarea 6)
Figure II-8:    Existing Utility Lines, Yosemite Village (Subarea 7)
Figure II-9:    Existing Utility Lines, Camp 6/Cook’s Meadow (Subarea 8)
Figure II-10:  Alternative 1 - No Action, Happy Isles (Subarea 1)
Figure II-11:  Alternative 1 - No Action, Campgrounds (Subarea 2)
Figure II-12:  Alternative 1 - No Action, Ecological Restoration (Subarea 3)
Figure II-13:  Alternative 1 - No Action, The Ahwahnee (Subarea 4)
Figure II-14:  Alternative 1 - No Action, Curry Village (Subarea 5)
Figure II-15:  Alternative 1 - No Action, Housekeeping (Subarea 6)
Figure II-16:  Alternative 1 - No Action, Yosemite Village (Subarea 7)
Figure II-17:  Alternative 1 - No Action, Camp 6/Cook’s Meadow (Subarea 8)
Figure II-18:  Alternative 2, Happy Isles (Subarea 1)
Figure II-19:  Alternative 2, Campgrounds (Subarea 2)
Figure II-20:  Alternative 2, Ecological Restoration (Subarea 3)
Figure II-21:  Alternative 2, The Ahwahnee (Subarea 4)
Figure II-22:  Alternative 2, Curry Village (Subarea 5)
Figure II-23:  Alternative 2, Housekeeping Camp (Subarea 6)
Figure II-24:  Alternative 2, Yosemite Village (Subarea 7)
Figure II-25:  Alternative 2, Camp 6/Cook’s Meadow (Subarea 8)
Figure II-26:  Construction Phasing
Figure II-27:  Proposed Utility Corridor Cross-Sections
Figure II-28:  Proposed Utility Corridor Cross-Sections
Figure II-29:  Merced River Utility Corridor Crossing Cross-Section
Figure II-30:  Alternative 3, Camp 6/Cook’s Meadow

Appendices

California Regional Water Quality Control Board Cleanup and Abatement Order
B  Regulation and Policies
C
 Merced Wild and Scenic River Section 7 Determination
Yosemite Valley Sanitary Sewer System Capital Improvement Plan Excerpts
Draft Floodplain Statement of Findings for the East Yosemite Valley Utilities Improvement Plan
Draft Wetland Statement of Findings for the East Yosemite Valley Utilities Improvement Plan
Special-Status Species Evaluation
Projects Included in the Cumulative Impact Analysis

________________________________________________________________________

 

 
 

Top left round

Main | Superintendent's Letter | Abstract | Executive Summary | Table of Contents | Chapter 1 | Chapter 2 | Chapter 3
Chapter 4 | Chapter 5 | Chapter 6
| Chapter 7 | Chapter 8 | Chapter 9 |
Tables | Figures | Appendices

Top right round