Status
of Projects
Planning
Clearinghouse 2002
Updated
9/25/2002
|
Project
# |
Month heard at PCH |
Location |
Title |
Proponent |
Division Chief
approval? |
Supt. approval? |
Conditions and Comments |
Natural Resource
Coord. Required[1] |
Cultural Resource
Coord. Required[2] |
Project meets the terms and conditions of a
Categorical Exclusion? Documentation complete? |
|
2000-067 |
July |
Tuolumne |
Campground
Amphitheater Rehabilitation |
Glen Rothell |
Yes |
Yes |
Project was placed
on hold July 2000 pending concurrence of historic preservation officer,
facilities management, and the management team regarding benching material.
In July 2002, the project was reduced in scope to address only replacement
and repair of seating. Address accessibility portions of the project in a
different comprehensive proposal that would include the restrooms and other
areas. Ensure temperature of seating surface will be appropriate. Coordinate
with historic architect. |
No |
Yes |
Yes |
|
2002-001 |
Feb |
Crane
Flat |
Campground
Septic Tank Replacement |
Kelly White |
Yes |
Yes |
Consultation
with Native American tribes recommended. Consult with Vegetation Management
to ensure that stockpiled soil does not have an adverse impact on existing
vegetation. |
Yes |
Yes |
Yes |
|
2002-002 |
April |
Yosemite
Valley |
North
Pines & Lower Pines Electric Rehab |
Kelly White/ Don
Coon |
Yes |
Yes |
Project
was originally discussed at Planning Clearinghouse in February 2002. At that
time, the proponent was asked to evaluate another alternative, bringing the
line across Clark's Bridge rather than under the river in the current
alignment. In April 2002, the proponent reported that it would cost an
additional $275,000 to bring the line across Clark's Bridge. A new route was
proposed that would continue to bring the line under the river in its current
location, with additional trenching in existing road prisms. The proponent
was directed to fit the utility alignment in to the long-term vision for the
area. Cultural resource data
recovery took place in 1988 for the original realignment, as part of the Environmental
Assessment, Rehabilitate Electrical System Phase 9A. Review the original
analysis to ensure that cultural resource impacts were evaluated for the new
footprint. If the proposed new realignment would take place outside of what
was previously evaluated, new cultural resource analysis must take place. Resources management is
directed to work with the Utility Shop to track erosion on the north bank of
the Merced River near North Pines CG through high water of 2002. After high
water, evaluate the need for an organic revetment system on the north bank. |
|
Yes |
This Categorical
Exclusion will cover this project only if there will be a finding of no
effect on cultural resources. |
|
2002-003 |
Feb |
Yosemite
Valley |
Tree
Removal at Valley Visitor Center |
Ginger Burley |
Yes |
Yes |
Project modified
May 2002 to include only trees that have encroached into in formal landscaped
zones that are less than 10 feet tall, and 20 additional trees with a
diameter of no greater than one foot. |
|
|
Yes |
|
2002-004 |
Feb |
Back-country |
Preliminary
Restoration of Mountain Yellow-legged Frogs |
Steve Thompson |
Yes |
Pending |
Environmental
Assessment recommended. |
|
|
Environmental
Assessment recommended. |
|
2002-005 |
Feb |
El
Portal |
Exotic
Plant Eradication |
Lisa Ordonez |
Yes |
Yes |
Complete integrated pest management
plan. Ensure no adverse impacts to natural and cultural resources. |
|
|
Yes |
|
2002-006 |
Feb |
Parkwide |
Exotic
Plant Control |
Lisa Ordonez |
Yes |
Yes |
Development of
long- and short- term strategy required. |
|
|
Yes |
|
2002-007 |
Feb |
Back-country |
Wilderness
Restoration |
Sue Fritzke/ Vicky
Hartman |
Yes |
Yes |
|
|
|
Yes |
|
2002-008 |
Feb |
Tuol.
Mdws. |
Gaylor
Pit Restoration |
Sue Fritzke |
Yes |
Yes |
Complete
formal HazMat determination. Environmental
Assessment required. Complete a NHPA
Section 106 determination/clearance for adverse affects to historic roads. |
|
|
Environmental
Assessment required |
|
2002-009 |
Feb |
Yosemite
Valley |
Happy
Isles Dam Removal |
Sue Fritzke/ Marie
Denn |
Yes |
Yes |
Environmental
Assessment required. Complete
a NHPA Section 106 determination of non-eligibility. Complete a Wild and
Scenic Rivers Act Section 7 analysis / determination |
|
|
Environmental
Assessment required |
|
2002-010 |
Feb |
Yosemite
Valley |
Ozone/NOx
Monitor Siting |
Katy Warner |
Yes |
Yes |
Permissible only on
non-historic outbuilding structures. No new structures. |
|
|
Yes |
|
2002-011 |
Feb |
Vernal/ Nevada
Falls |
Sewer
System Upgrade |
Korwin Kirk |
No |
|
Tabled pending
Division Chief approval. |
|
|
|
|
2002-012 |
Feb |
Vernal
Falls |
Water
System Upgrade |
Korwin Kirk |
No |
|
Tabled pending
Division Chief approval. |
|
|
|
|
2002-013 |
Feb |
Vernal
Falls |
Comfort
Station Upgrade |
Korwin Kirk |
No |
|
Tabled pending
Division Chief approval. |
|
|
|
|
2002-014 |
Feb |
Sunrise |
Water
System Pipeline Replacement |
Korwin Kirk |
Yes |
Yes |
Complete Wilderness Minimum tool
determination. |
|
Yes |
Yes |
|
2002-015 |
Feb |
Sunrise |
Water
Storage Tank Pad Development |
Korwin Kirk |
Yes |
Yes |
Install
water tank in the existing structural footprint of water system. Wilderness
minimum tool determination required. Proponent
may be unable to install water tank within structural footprint. Project
returned to proponent for further study. |
|
|
Yes |
|
2002-016 |
Feb |
Cascades |
Remove
Excess Residence and Outbuildings |
Larry Harris |
Yes |
Yes |
Before scheduling
for removal, complete XXX/NHPA Section 106 process, obtain State Historic
Preservation Office concurrence, and integrate comments. No burning of
structures. |
|
Yes |
Project evaluated
under the Final Yosemite Valley Plan
SEIS |
|
2002-017 |
Feb |
Yosemite
Valley |
Rehabilitate
Yosemite Valley Campground Restrooms |
Tom Clark |
Yes |
Yes |
|
|
|
Yes |
|
2002-018 |
Feb |
Yosemite
Valley |
Curry
Village Storage Lockers |
Mark Gallagher
(YCS) |
Yes |
Pending |
Ensure that an
adequate number of the lockers are accessible to visitors with disabilities.
XXX required. |
|
|
Approval
pending Superintendent concurrence. |
|
2002-019 |
Feb |
Yosemite
Valley |
Mitigate
Tree Hazards at Yosemite Indian Gardens |
Brian Mattos |
Yes |
Yes |
Consult with tribal
council. Replant area with new oaks as trees are removed. |
|
Yes |
Yes |
|
2002-020 |
Feb |
Parkwide |
Prune/Remove
Encroaching Trees Along Roadways |
Brian Mattos |
Yes |
Pending |
For roadside tree
thinning within the Merced River corridor, project proponent must contact the
Resource Management Division (cultural and natural resource staff) before
initiation of work to evaluate trees on an individual basis. Determine
whether trees could be felled and left in place to retain woody debris in the
ecosystem and insure that trees are not important roosting or nesting sites
for special status species. For projects that would remove more than
three trees in a project site, the following steps should apply: 1. Consult with Resource Management staff.
2. Consult with Compliance staff, who will recommend action. 3. Confirm with
Assistant Superintendent (Chip Jenkins) who will either approve project or
bring to park management. |
See
“Conditions” |
See
“Conditions” |
Approval
pending Superintendent concurrence. |
|
2002-021 |
Feb |
Sunrise |
Monitor/Control
Lodgepole Needle Miner |
Brian Mattos |
See comments |
See comments |
Control of
lodgepole needle miner denied (including pesticide use). Continued monitoring
approved. Project revisited
at the July 2002 PCH. Proponent asked whether hazardous trees that die from
needle miner injury should be removed. Proponent was given the go-ahead to
remove dead hazardous trees. |
|
|
Yes |
|
2002-022 |
Feb |
Parkwide |
Sudden
Oak Death (SOD) Notification Program |
Brian Mattos |
Yes |
Yes |
Project delegated
to the Communication Team for implementation. |
|
|
Yes |
|
2002-023 |
Feb |
Hetch
Hetchy |
O'Shaughnessey
Dam Discharge Modification |
Mary Kline (City of
SF) |
|
|
Informational item.
Mary Kline directed to prepare a consolidated “park response” in letter form
to the City of San Francisco. |
|
|
N/A |
|
2002-024 |
Feb |
El
Portal |
Highway
140 Rock Slope Protection |
Caltrans |
|
|
Informational item.
Mark Butler directed to prepare a consolidated response to the proposal. Project not funded
in near future |
|
|
N/A |
|
2002-025 |
Feb |
Yosemite
Valley |
Happy
Isles Fen Habitat Reclamation |
Marie Denn |
Yes |
Yes |
Integrate into
special project work schedule. |
|
|
Yes |
|
2002-026 |
Feb |
Yosemite
Valley |
Yosemite
Valley - Eagle Creek Ecological Enhancement |
Marie Denn |
Yes |
Yes |
Re-evaluate the
proposal to retain parking. |
|
|
Yes |
|
2002-027 |
|
Back-country |
Illilouette
Creek Monitoring |
Tony DiStefano |
Yes |
Yes |
|
|
|
Yes |
|
2002-028 |
|
Yosemite
Valley |
Happy
Isles Fen Stream Gage Solar Panels |
Tony DiStefano |
Yes |
Yes |
|
|
|
Yes |
|
2002-029 |
|
Yosemite
Valley |
Happy
Isles Acoustic River Monitor |
Tony DiStefano |
Yes |
Yes |
|
|
|
Yes |
|
2002-030 |
April |
Tuol. Mdws. |
Service
Station SVE Shed |
Vicki McMichael |
Yes |
Yes |
|
|
|
Yes |
|
2002-031 |
April |
Parkwide |
Routine
Trail Maintenance |
Tim Ludington |
Yes |
Yes |
Trail crew leaders
will attend refresher session w/archeologists re: protection of arch
resources at beginning of season, and crew camps will be surveyed prior to
occupancy by cultural resource specialists to avoid resource impacts.
Employees are aware that artifacts are protected and work will stop
immediately if suspicious soil layers are found. Care will be used to avoid
damage to known special status plants. |
|
Yes |
Yes |
|
2002-032 |
April |
Turtle-back
Dome |
Air
Quality Monitoring |
Katy Warner |
Yes |
Yes |
|
|
|
Yes |
|
2002-033 |
April |
El
Portal |
Hazard
Fuels Crew Office and Cache |
Kelly Singer |
Yes |
Yes |
Maintain
access around trailer for emergency, maintenance, and other approved
purposes. Meet with the El Portal Planning Advisory Council to inform them of
the decision to approve this project. |
|
|
Yes |
|
2002-034 |
April |
Parkwide |
Proposed
Spring Prescribed Burns |
Dan Buckley |
Yes |
Yes |
Address public
safety along the Tioga Road for non-vehicular traffic. |
|
|
Yes |
|
2002-035 |
April |
Yosemite
Valley |
Fire
Engine Covered Parking |
Aaron Fritzer |
Yes |
Yes |
Meet
with the historic architect to ensure that the building is not a historic
structure and that the proposed action will be structurally sound. |
|
Yes |
Yes |
|
2002-036 |
April |
Out-of-Park |
YARTS Staging Areas |
YARTS Joint Powers
Authority |
|
|
Informational item
- release of Notice to Adopt a Mitigated Negative Declaration. Comments due
April 10, 2002. Division Chiefs are in support of the preferred alternative.
A response will not be prepared due to lack of time. |
|
|
N/A |
|
2002-037 |
April |
El Portal |
Yager Garage
Tear-down and Replacement |
Marty Nielson |
Yes |
Yes |
A building permit will be obtained
from the County, and all new construction will meet code and County
inspection. Project proponent is responsible for coordination with the
Resource Management Division to ensure protection of cultural resources –
monitoring recommended. |
|
Yes |
Yes |
|
2002-038 |
May |
Wawona |
Larke Lane Tree
Hazard |
Phil Willitts, SBC
Comm. |
Yes |
Yes |
This is an emergency action as the
tree is in eminent danger of falling. An archeologist has determined that
there would be no effect on cultural resources. The project was given the
go-ahead to remove the tree immediately. |
|
|
Yes |
|
2002-039 |
May |
Tuol.
River |
Tuolumne
River - Alpine River Monitoring System |
Russell
Galipeau |
Yes |
Pending |
Resubmit for
approval with either Wilderness Minimum Tool Requirement or a corrected
decision record that identifies that this requirement is not necessary
because the project is not in wilderness. |
|
|
No |
|
2002-040 |
May |
Tioga
Road |
Alpine
Meteorology Monitoring System |
Russell Galipeau |
Yes |
Yes |
|
|
|
Yes |
|
2002-041 |
May |
Merced
Lake HSC |
Merced
Lake Remote Climate Sensor |
Mark Butler |
Yes |
Yes |
|
|
|
Yes |
|
2002-042 |
May |
Hodgdon
Meadows |
Remote
Climate Sensor |
Mark Butler |
Yes |
Yes |
Coordinate
with cultural resource specialists to ensure there will be no impact on
archeological resources. |
|
Yes |
Yes |
|
2002-043 |
May |
Wawona |
Pole
Placement at Lot 8 & 9 |
Phil Willitts |
Yes |
Yes |
Consult with
cultural resource specialists to determine the best placement of the pole and
to ensure no effect on archeological resources. |
|
Yes |
Yes |
|
2002-044 |
May |
Back-country
- |
Environmental
Monitoring and Assessment Program |
Russell Galipeau |
Yes |
Yes |
Inform Visitor
Protection (Beth Waldow) of collection dates. |
|
|
Yes |
|
2002-045 |
May |
Back-country |
Parkwide
- Amphibian
Disease Dynamics in a Fragmented Landscape |
Russell Galipeau |
Yes |
Yes |
No
helicopter use. Complete
Wilderness Minimum Tool Requirement File written
documentation of U.S. Fish and Wildlife Service consultation with the Office
of Strategic Planning, before initiation of project. |
|
|
Pending USFWS
letter. |
|
2002-046 |
May |
Parkwide |
Amphibian
Disease Dynamics in a Fragmented Landscape |
Russell Galipeau |
Yes |
Yes |
File
written documentation of U.S. Fish and Wildlife Service consultation with the
Office of Strategic Planning, before initiation of project. |
|
|
Pending USFWS
letter. |
|
2002-047 |
May |
Crane
Flat |
Bear
Canister Drop Bin |
Carolyn Anaya |
Yes |
Yes |
Ensure bin will not
tip over. |
|
|
Yes |
|
2002-048 |
May |
Parkwide |
Identifying
Reference Conditions for Prescribed Fire |
Kara Paintner |
Yes |
Yes |
|
|
|
Yes |
|
2002-049 |
May |
Parkwide |
Meadow
Fragmentation Effects |
Russell Galipeau |
Yes |
No |
Resources
Management to review project and determine there will be no adverse effects,
or complete an Environmental Assessment |
Yes |
|
No |
|
2002-050 |
May |
Back-country |
Historical
Wildland Fire Use |
Russell Galipeau |
Yes |
No |
No helicopter use. Resources
Management to review project and determine there will be no adverse effects.
Resubmit. Complete wilderness minimum
tool requirement |
Yes |
|
No |
|
2002-051 |
May |
Back-country |
Determining Differential
Growth, Longevity, and Age at Maturity - Mountain
Yellow-Legged Frog |
Russell Galipeau |
Yes |
Yes |
Coordinate with
other amphibian research projects to minimize the number of people doing
research on-site at a given time. |
|
|
Yes |
|
2002-052 |
May |
Parkwide |
Tree-Ring Sampling and
Analysis as Part of the Project: "Learning in the
Woods: Decadal Climate, Water Supply, and Fire Frequency in the Great
Basin" |
Russell Galipeau |
Yes |
Yes |
Preserve cores at a
“tree ring lab” to avoid repeated coring. |
|
|
Yes |
|
2002-053 |
May |
|
Parkwide
- The Demographic Controls of
Sierran Forest Dynamics |
Russell Galipeau |
Yes |
Yes |
|
|
|
Yes |
|
2002-054 |
May |
El Portal |
Yosemite View Lodge
Modification |
Mariposa County |
|
|
Prepare Supt.
response. Mailed 6/6/02. |
|
|
N/A |
|
2002- 055 |
May |
Yosemite Valley |
Emergency
Replacement of Wastewater Line |
Jeff Harsha |
Yes |
Yes |
|
|
|
Yes |
|
2002-056 |
May |
Parkwide |
Wild Turkey
Population Enhancement |
Calif. Dept. Fish
and Game |
N/A |
N/A |
Informational Item.
Prepare park response. |
No |
No |
N/A |
|
2002-057 |
July |
Glacier Point Road |
Telephone Cable
Replacement |
Phil Willitts (SBC
Communi-cations |
Yes |
Yes |
Ensure that project
occurs within the existing utility corridor. Remove existing materials that
are being replaced. Coordinate design, placement, and installation of water
bars with NPS Trails Office. |
No |
No |
Yes |
|
2002-058 |
July |
Big Oak Flat Road |
San Joaquin
Overlook Vista Restoration |
Jeff Power |
Yes |
Yes |
Coordinate with NPS
Wildlife Biologist |
Yes |
No |
Yes |
|
2002-059 |
July |
Parkwide |
Review Hazard Tree
SOP |
Larry Castro |
N/A |
N/A |
Proponent directed
to meet to review SOP |
|
|
N/A |
|
2002-060 |
July |
Tioga Pass |
Tioga Pass Webcam |
Mark Butler |
Yes |
Yes |
Consult with NPS
Electrical shop. Consult with NPS Interpretation and IM re: internet backbone
and bandwidth. Consult with Project Management (Brenda Ostrom) to coordinate
with entrance station security project. Move floodlighting that is currently
attached to a lodgepole pine to the new pole, if possible. |
No |
No |
Yes |
|
2002-061 |
July |
Parkwide |
PGE Permit
Extension |
Brian Mattos |
Yes |
Yes |
See conditions on
permit |
Yes |
Yes |
Yes |
|
2002-062 |
July |
Yosemite Valley |
Reduce Water
Consumption at Indian Gardens |
Jeff Harsha |
Yes |
Yes |
Explore ways to
recirculate 100% of the water. Consult with archeological staff to determine
if monitoring is necessary. Project is contingent upon no adverse impacts to
cultural resources. |
No |
Yes |
Yes |
|
2002-063 |
July |
May Lake HSC |
May Lake High
Sierra Camp Water Filter |
Korwin Kirk |
Yes |
Yes |
Coordinate with
cultural resource staff to address cultural resource concerns. Project is
contingent upon no adverse impacts to cultural resources. |
No |
Yes |
Yes |
|
2002-064 |
July |
Merced Lake HSC |
Restoration and
Revegetation Project |
Vicky Hartman /
Mark Gallagher (YCS) |
Yes |
Yes |
Conduct subsurface
archeological survey before project initiation to determine scope of the
project and preferred restoration methods. NPS natural and cultural resource
coordination required. |
Yes |
Yes |
Yes |
|
2002-065 |
July |
Yosemite Valley |
Wetlands Survey and
Mean High Water Survey |
Samantha Weber |
|
Yes |
Provide copies of
archeological site maps within the area of potential effect and information
and maps from the 1993 Bibby study of ethnographic use and resources to the
COTR for the project. Should test pits be required within these areas the
COTR would first contact the park archeologist (Kirn) and for ethnographic
gathering (Forgang) so that specific locations to minimize potential data
loss, in house archeological clearance and a decision whether an
archeological monitor needs to be onsite. For ethnographic gathering sites,
Forgang will contact the tribal representative to see if a Native American
monitor is required. Forgang will consult on this project with the AICMC on August
1st. |
Yes |
Yes |
Yes |
|
2002-066 |
August |
Yosemite Valley |
Curry Village
YCS/YI Bulletin Boards |
Moose Mutlow, YI |
Yes |
Yes |
Consult with Marty
Nielson, NPS Business and Revenue Management and NPS Sign Shop |
No |
No |
Yes |
|
2002-067 |
July |
Glacier Point |
YCS/YA Web Camera |
Steve Medley, YA;
Kevin Kelly, YCS |
Yes |
Yes |
Ensure that people
are not recognizable in view, ensure that satellite dish and associated
equipment are not visible |
No |
No |
Yes |
|
2002-068 |
August |
Crane Flat |
Gas Station Cement
Pad Replacement |
Vicki McMichael,
YCS |
Yes |
Yes |
Coordinate with
Marty Nielson, NPS Business and Revenue Management |
No |
No |
Yes |
|
2002-069 |
|
|
|
|
|
|
|
|
|
|
|
2002-070 |
August |
Tuolumne |
Climbing Bulletin
Boards |
Mark Fincher |
Yes |
Yes |
Coordinate with
Business and Revenue Management and Yosemite Concession Services |
No |
No |
Yes |
|
2002-071 |
August |
Tuolumne |
Daff Dome Approach
Trail Restoration |
Mark Fincher |
Yes |
Yes |
|
Yes |
No |
Yes |
|
2002-072 |
|
|
|
|
|
|
|
|
|
|
|
2002-073 |
|
|
|
|
|
|
|
|
|
|
|
2002-074 |
|
|
|
|
|
|
|
|
|
|
|
2002-075 |
|
|
|
|
|
|
|
|
|
|
|
2002-076 |
August |
Yosemite Valley |
Water Line Repair
at Upper Pines Campground |
Paul Laymon |
— |
Yes |
Emergency fix |
— |
— |
Yes |
|
2002-077 |
August |
Yosemite Valley |
Electric Feeder
Repair at North Pines Campground |
Paul Laymon |
— |
Yes |
Emergency fix |
— |
— |
Yes |
|
2002-078 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
[1] Project is contingent upon no adverse impact to natural resources. Project proponent is responsible for coordination with the Resource Management Division to ensure protection of natural resources.
[2] Project is contingent upon no adverse impact to cultural resources. Project proponent is responsible for coordination with the Resource Management Division to ensure protection of cultural resources.