Preservation
Projects
|
| Plan,
Project, or Report |
Initial
public outreach |
Technical
Report/
Study |
Public
comment (scoping) |
Plan
develop ment |
Public
review & comment (EA
or EIS) |
Produce
final plan/ report |
Decision
document |
Imple-
ment-
ation |
| Merced
Wild and Scenic River Revised Comprehensive Management Plan [web
page] [additional information] |
|
|
Done (June 9,
2007) |
|
|
|
|
|
Fire Management Plan
[web page] |
Done |
Not
applicable |
Done |
Done |
Done
(8/27/02) |
Done |
ROD
(8/04) |
In
progress |
Remove
Cascades Dam
[web page] |
Done |
Not
applicable |
Done |
Done |
Done
(3/24/03) |
Done |
FONSI
(5/2003) |
Done |
Visitor
Use and Floodplain Restoration
[28 kb pdf fact sheet]
[1.4 MB pdf of report]
|
In
progress |
In
progress |
Done
(5/4/03) |
In
progress |
|
|
|
|
McCauley
Ranch/Crocker Ridge Wilderness Suitability Assessment
[20 kb pdf] |
Done |
In
progress |
Not
applicable |
Not
applicable |
Not
applicable |
Not
applicable |
In
progress |
Not
applicable |
Happy Isles
Bridge Removal
[200 kb pdf]
[see EA/FONSI web
page] |
Done |
Not
applicable |
Done |
Done |
Done |
|
FONSI |
Done |
Cook's
Meadow Restoration
[14 kb pdf] |
Done |
Done |
Done |
Done |
Done |
Done |
Done |
Done |
Eagle
Creek Restoration
[23 kb pdf] |
Not
applicable |
Not
applicable |
Not
applicable |
Done |
Not
applicable |
Not
applicable |
Done |
Done |
| Happy
Isles Fen Restoration [34
kb pdf] |
Not applicable |
Not applicable |
Not applicable |
Done |
Not applicable |
Not applicable |
Done |
Done |
| Parkwide
Invasive Plant Management Plan [web page] |
|
|
Done
(2/15/05) |
In progress |
|
|
|
|
Aquatic
Habitat and Mountain Yellow-Legged Frog Restoration Project
[86 kb pdf] |
|
|
Done
(6/16/06) |
|
|
|
|
|
| El
Capitan Meadow Restoration Project |
Not applicable |
Not applicable
|
|
|
|
|
|
|
Valley
Improvement Projects |
| Plan,
Project, or Report |
Initial
public outreach |
Technical
Report/
Study |
Public
comment (scoping) |
Plan
develop ment |
Public
review & comment (EA
or EIS) |
Produce
final plan/ report |
Decision
document |
Imple-
ment-
ation |
| Improve
Lower Yosemite Fall Area [28
kb pdf] Archeology
in the Lower Yosemite Fall Area [70
kb pdf]
Tree
removal at Lower Yosemite Fall area [24 kb pdf]
[see
EA/FONSI web page] |
Done |
Not
applicable |
Done |
Done |
Done |
Done |
FONSI |
Done |
|
Yosemite
Lodge Area Redevelopment
[web page]
(Yosemite Lodge, Camp 4 redesign, & Northside
Drive realignment) [82 kb pdf]
Design Indian Cultural Center
[24
kb pdf]
Build-out
map [1.2 MB jpg]
Pre-1997 map [0.9 MB jpg] |
Done |
Not
applicable |
Done
(10/26/02) |
Done |
Done |
Done |
FONSI
(2/04) |
In
progress |
Curry
Village & East Valley
Campgrounds Improvements
[web page] [30
kb pd fact sheet] |
Done |
Not
applicable |
Done
(10/26/02) |
Done |
Done |
Done |
FONSI
(2/04) |
In
progress |
Construct Curry Village Employee Dorms
[26
kb pdf] |
Done |
Not
applicable |
Done
(YVP) |
Done |
Done
(YVP) |
Done |
Done
(YVP) |
In
progress |
| Purchase
Valley Shuttle Buses [500
kb pdf] |
In
progress |
Not
applicable |
Done
(YVP) |
Done |
Not
applicable |
|
Done |
Done |
| East
Valley Utilities Improvement Plan |
In progress |
Not applicable |
Done
(3/14/03)
|
Done |
Done
(9/2) |
Done |
FONSI
(12/03) |
In progress |
| Shuttle
Bus Stop Improvement |
Done |
Not applicable
|
|
|
|
Done |
Done |
In progress |
| Rehabilitation
of Yosemite Valley Loop Road |
|
|
Done
(6/1/05) |
Done |
Done |
|
FONSI
(2/06) |
|
Yosemite
Village Interim Parking Improvements
Public
comments received during the scoping period [1.09 MB pdf]
|
|
Not applicable
|
Done (3/18/04) |
In progress |
|
|
|
|
| Reconstructing
Critically Eroded Sections of the El Portal Road |
Not applicable
|
Not applicable |
Done
(12/28/06) |
In progress |
Ended
July 3, 2007 |
|
FONSI
8/07 |
|
| Tunnel
View Overlook Rehabilitation |
Not applicable
|
Not applicable
|
Ended
July 9, 2007 |
|
|
|
|
|
Out
of Valley Projects |
| Plan,
Project, or Report |
Initial
public outreach |
Technical
Report/
Study |
Public
comment (scoping) |
Plan
develop ment |
Public
review & comment (EA
or EIS) |
Produce
final plan/ report |
Decision
document |
Imple-
ment-
ation |
| Tuolumne
Wild and Scenic River Comprehensive Management Plan/Tuolumne Meadows
Plan EIS |
|
|
Done
(9/7/06) |
In progress |
|
|
|
|
| Out-of-Valley,
Parkwide Campground Study [27
kb pdf] |
Done |
Done |
Not
applicable |
Pending
Congressional action |
|
|
|
|
| Replace
Valley Flood Damaged Offices in El Portal [48
kb pdf] |
Done |
Not
applicable |
Done
(10/26/02) |
Done |
Done
(YVP) |
Done
(YVP) |
Done
(7/18/03) |
In
progress |
| Environmental
Education Campus [200
kb pdf] |
Done |
Not
applicable |
Done
(11/14/02) |
In
progress |
Draft
EIS expected 2007 |
|
|
|
South
Fork Bridge Replacement
[web page] |
Done |
Not
applicable |
Done
(10/26/02) |
Done |
Done
(5/29/03) |
Done |
FONSI
(8/03) |
In
progress |
| Rehabilitation
of Glacier Point Road |
|
|
Done
(9/16/05) |
Done |
Ended
July 27, 2007 |
|
|
|
|
Wawona Covered Bridge Restoration [232
kb pdf] |
Not
applicable |
Not
applicable |
Not
applicable |
Done |
Not
applicable |
Not
applicable |
Done |
Done |
| Hetch
Hetchy Communications System Upgrade |
Done |
Not applicable |
Done (4/10/06) |
In progress |
|
|
|
|
| Hodgdon
Meadow Trailer Replacement Project [web
page] |
|
|
Done
(4/14/06) |
Done |
In
progress until Aug. 15, 2007 |
|
|
|