Yosemite National Park Half Dome
 
Home > Park Management > Requsting Documents & Making Comments
Contact Us

Half Dome

Trip Planning
Yosemite Today
Nature & History
Students & Teachers
Park Management
Working in the Park
Support  Your Park
Search/Help
Home
Experience Your America

 

Also in this section

Park Management
Document Requests

Categorical Exclusions for 2003

 

2003-002 Development and Evaluation of New Tools for Managing Nuisance Black Bears (Ursus americanus) in Yosemite National Park: Phase 2
2003-003 Dynamics of Climate-Growth Responses in the Red Fir/White Fir Ecotone
2003-004 Lichens as Bioindicators: A Comparative Analysis of Protective Regimes Within Nature Reserves Utilizing Lichen Populations and Heavy Metals Concentrations
2003-005 Molecular Systematics and Population Genetics of the Varieties of Astragalus lentiginosus (Fabaceae)
2003-006 Prevalence of Coliform and Other Pathogenic Bacteria in Sierra Nevada National Parks and Wilderness Area Lakes and Streams
2003-007 Repair Fire Damage to Residence #44
2003-008 Install Piping for Residence #7 Propane Tank
2003-009 Replace unsafe doors in Valley Maintenance Building (Bldg #527)
2003-015 Rehabilitate White Wolf and Crane Flat Campground Restrooms
2003-016 Residential 2000 Sewer
2003-017 Residential 1 Structural Mothballing
2003-019 Reinstall Bulletin Boards
2003-021 Temporary Power Poles Installation at Lower Pines Campground
2003-022 Glacier Point Septic System
2003-024 Lang House Septic Tank Replacement
2003-025 Solar Project for El Portal WWTP
2003-026 Tuolumne Meadows Corral Drainage Modifications
2003-027 Lower Falls Parking Lot Removal – Bus Operations and Parking Relocation
2003-028 Abate asbestos in and around Hetch Hetchy Locomotive
2003-031 Big Oak Fee Office Rockscape
2003-035 Ballerini Phone Line
2003-037 Repair Front Decking on Valley Residence #80
2003-038 Replace Back Porch Roof of Valley Residence #13
2003-040 Interior Rehabilitation of Non-Historic Parkwide Residences
2003-044 Paint Exterior Buildings and Residences Parkwide
2003-045 Pioneer Cemetery Enhancement
2003-050 Parkwide – Modify Select Facilities with ADA upgrades (Phase Three) – Construct DEGNAN”S Elevator
2003-051 Replace Door at Tuolumne Mountain Shop
2003-052 Maintain Unpaved Road Surfaces in the Township of Foresta (C110)
2003-054 El Portal Fire Station Dormer Addition
2003-055 East Valley Utilities Plan
2003-056 Soda Springs Trail Reconstruction
2003-059 Yosemite National Park Fire Management Plan
2003-062 South Fork Merced River Bridge Replacement
2003-063 Seventh Day Adventist Land Exchange
2003-066 Tuolumne Grove Restoration
2003-067 Doghouse Meadow Weather Station
2003-068 Porcupine Flat Weather Station
2003-070 South Landing Shooting Range
2003-071 Lyell Fork Tuolumne River (near Maclure Creek) Stream Monitoring
2003-072 Gaylor Creek Stream Monitoring
2003-073 Badger Housing for Ahwahnee Roof Project (Correct Snow and Water Removal Deficiencies – Slat Roof)
2003-074 Tuolumne River (Tuolumne Meadows) Stream Monitoring
2003-077 Gaylor Lakes Basin; Spring Runoff Monitoring
2003-081 Set Up Construction Management Office Trailers
2003-083 Ecological Restoration of Flooded Campgrounds
2003-084 Curry Village Employee Housing Project (MTF and Supplemental MTF)
2003-085 Replacement of Valley Flood-Damaged Offices within a New Building at El Portal
2003-086 Shuttle Bus Procurement Project

 
spacer
Yosemite National Park Home Page
http://www.nps.gov/ /archive/yose/planning/documents/catex/2003/index.htm
Last modified Wednesday, 22-Dec-2004 10:13:36 Eastern Standard Time
Yosemite National Park Web Manager
 
  spacer