Abstract

 

Executive Summary

Introduction

Purpose Of and Need For the Project

Relationship to Other Plans

Overview of the Alternatives

Environmentally Preferable Alternative

 

Letter From The Superintendent

 

 

Chapter I: Purpose and Need

Introduction

Purpose Of and Need For the Project

Planning Context

Management Goals

Issues and Concerns

Organization of the Cascades Diversion Dam Removal Project Environmental Assessment

 

Chapter II: Alternatives

Overview of the Alternatives

   Alternative 1: No Action

   Alternative 2: Complete Dam Removal

   Alternative 3: Partial Dam Removal

Alternatives Considered but Dismissed

   Remove Cascades Diversion Dam and Complete Sediment Removal

   Restore Cascades Diversion Dam and Hydroelectric Generating Facility

   Replace Cascades Diversion Dam with Boulders

   Remove Portions of the Dam Over Time

   Combine the Removal of Cascades Diversion Dam with the Final Phase of theEl Portal Road Improvement Project

    Mitigation Measures Common To All Action Alternatives

   Sustainable Design and Aesthetics

   Best Management Practices During Dam Removal

   Resource-Specific Measures

Comparison of Alternatives

Summary of Environmental Consequences

 

 

Chapter III: Affected Environment

Introduction

   Impact Topics Considered in this Plan

   Impact Topics Dismissed from Further Analysis

Regional Setting

Local Setting – Cascades Diversion Dam Project Area

Natural Resources

   Geology, Geologic Hazards, and Soils

   Hydrology, Floodplains, and Water Quality

   Wetlands

   Vegetation

   Wildlife

   Special-Status Species

   Air Quality

   Noise

Cultural Resources

   Overview of Human Occupation

   Archeological Resources

   Ethnographic Resources

   Cultural Landscape, including Historic Sites and Structures

Social Resources

   Transportation

   Scenic Resources

   Recreation

   Orientation and Interpretation

   Socioeconomics

   Park Operations

 

 

Chapter IV: Environmental Consequences

Introduction

   Cumulative Impacts

   Context, Duration, Intensity, and Type of Impact

   Impairment

Methodologies

   Natural Resources

   Cultural Resources

   Social Resources

Alternative 1 – No Action

   Natural Resources

   Cultural Resources

   Social Resources

Alternative 2 – Complete Dam Removal

   Natural Resources

   Cultural Resources

   Social Resources

Alternative 3 – Partial Dam Removal

   Natural Resources

   Cultural Resources

   Social Resources

 

 

Chapter V: Merced Wild and Scenic River

Introduction

Consistency with Management Elements of the Merced River Plan

 

 

Chapter VI: Consultation and Coordination

Compliance History

Scoping History

Agency Consultation

Future Information

List of Agencies, Organizations, and Businesses that Received the Cascades Diversion Dam Removal Project Environmental Assessment

 

 

Chapter VII: List of Preparers and Reviewers

 

Chapter VIII: Glossary

Glossary of Terms

Acronyms

 

 

Chapter IX: Bibliography

 

 

List of Figures (PDF)

I-1      Project Location

II-1     Existing Facilities

II-2     River Profile Between Pohono Bridge and Cascades Picnic Area

II-3     Alternative 2 – Complete Dam Removal

II-4     Cascades Diversion Dam Profile

II-5     Bioengineered Slope Protection – Schematic

II-6     Alternative 3 – Partial Dam Removal

 

 

List of Tables

II-1     Summary Comparison of Key Features of the Alternatives

II-2     Summary of Environmental Consequences

III-1    Turbidity

III-2    Population by County

III-3    2000 Employment by Major Industry Sector

III-4    2000 Economic Output by County and Industry Sector

III-5    2000 Total Taxable Retail Sales by County

IV-1    Typical Noise Levels from Heavy-Duty Equipment

 

Appendices

A       Regulations and Policies

B       Merced Wild and Scenic River Section 7 Determination

C       Draft Wetland Statement of Findings for the Cascades Diversion Dam Removal Project

D       Special-Status Species Evaluation

E       Projects Included in the Cumulative Impact Analysis

 

 

Environmental Assessment in PDF Format

 

Abstract

Executive Summary

Letter From The Superintendent

Table of Contents

Chapter I: Purpose and Need

Chapter II: Alternatives [part a | part b | part c]

Chapter III: Affected Environment

Chapter IV: Environmental Consequences

Chapter V: Merced Wild and Scenic River

Chapter VI: Consultation and Coordination 

Chapter VII: List of Preparers and Reviewers

Chapter VIII: Glossary

Chapter IX: Bibliography

Appendix A: Regulations and Policies

Appendix B: Merced Wild and Scenic River Section 7 Determination

Appendix C: Draft Wetland Statement of Findings for the Cascades Diversion Dam Removal Project

Appendix D: Special Status Species Evaluation

Appendix E: Projects Included in the Cumulative Impact Analysis

 

 

Main . Abstract . Executive Summary. Letter From The Superintendent . Table of Contents

Purpose and Need . Alternatives . Affected Environment . Environmental Consequences Merced Wild and Scenic River . Consultation and Coordination 

List of Preparers and Reviewers . Glossary . Bibliography . Appendices

Yosemite Home . Yosemite Planning Page