Spanish American War

 

THE "SITUADO" (ALLOWANCE) AND THE MATERIALS USED

IN THE CONSTRUCTION

 In the blank space on the left, enter the number which indicates the order in which the following steps take place:

_______ Insert the pin into the firing hole and break open the cartridge bag.
_______ Move the cannon a yard from the wall.
_______

Pray to Santa Barbara to ensure a well-aimed shot.

_______ Clean the bore with the wet sponge and repeat the firing process.
_______ Insert the cartridge in the bore and push it into the breach with the ram.
_______ Use the gun searcits to search for breaks in the bore.
_______ Point the cannon using the levers and the aiming wedges
_______ LOAD, ELEVATE, AIM, FIRE!!!
_______ Remove the pin and replace it with a primer.
_______ Clean the bore with the wet sponge
_______ Fire the primer with the fuse match
_______ Use the spoon to remove the unfired cartridge
_______ Move the cannon to the embrasure
_______ Use the rasp and the wormer to remove the residue and the accumulation of burned powder in the bore as necessary.

Index/Back /Next

____________
San Juan National Historic Site, Fort San Cristobal, Norzagaray Street, San Juan, PR 00901
Telephone: (787) 729-6777
Last Update: March, 2000