Exterior paint has been stripped and stucco repaired.

Kelso Depot Renovation Photos

March 17, 2003

Return to homepage

October 18, 2002 photos

December 11, 2002 photos

May 6-8, 2003 photos

Oct 15-22, 2003 photos

 
 
Click on photos for enlargements.
Roof tiles were removed and the roof was repaired. Original tiles are being reset. Copper structure on right side of roof was added to accommodate the elevator.

Inside the Beanery looking west.

 

 

Staircase from basement to first floor.