
Lower Haystack Creek

Lower Haystack Creek

Crews piling rock debris into a berm in order to divert run-off from undercutting the roadway near the West Side Tunnel


Damage just below the East Side Tunnel; this area needs to be evaluated by a geo-technical engineer.
|