FY 2000 Annual Performance Plan

Park/Program Id. No. FOPU (park/program four digit code) Page 01

Park/Program. Goal Id No: 1a Park Goal Number)

Servicewide Goal Identification number: 1a5

NPS Servicewide Mission/Long-term Goal: Natural and cultural resources and associated values are protected, restored and maintained in good condition and managed with their broader ecosystem and cultural context. 50% of the historic structures on the 1998 List of Classified Structures are in good condition.

Park/Program Long-term Goal: 1a.5 - By 2002, 50% of the historic structures on the 1999 List of Classified Structures are in good condition. Baseline Year: 1998 Target Year: 2002
Park/Program Annual Goal: 1a.5 - By September 30, 2000, 10, 787 of the 23,000 LCS Structures are in good condition (46.9%).
Performance Target this FY: 5 Structures on the LCS will be in good condition. Indicator: (Thing measured)

Historic structures

Baseline Number:

17 Structures

Desired Condition

(Condition tag): Good

Unit Measure: an historic structure (1)
FY99 Annual Work Plan
Work Plan Product/ Service Division Planned Output Contact Funding Category Dollars FTE
Maintain historic appearance of Fort Maint. Repaint replica flagpole, Gorge Rooms and Casemate Doors Chief of Maintenance ONPS
Restore and re-erect Cockspur Island Lighthouse cap & stairway. Maint. Reset Lighthouse cap, restore Keel, Lantern Wall, Stairway Chief of Maintenance ONPS/CRPP
Remove vegetation that is causing damage to the North Pier. Maint. Remove 300 linear feet of vegetation Chief of Maintenance ONPS
Remove vegetation growing in fort mortar joints. Maint. Remove vegetation from 45,000 sq/ft. Chief of Maintenance

Chief Ranger

ONPS
Remove vegetation around base of Wesley Memorial. Maint. Remove 50 sq/ft of vegetation Chief of Maintenance ONPS
Remove vegetation encroaching upon WWII bunkers Maint. Mow 1500 sq/ft. once a year Chief of Maintenance ONPS    
Remove vegetation encroaching upon Battery Hambright. Maint. Mow 2000 sq/ft. 24 times a year Chief of Maintenance ONPS    
Maintain humidity control and clean historic fort Maint.

Ranger

Sweep and dust 45,000 sq/ft casemates, rooms and stairwells. Obtain dehumidifiers Chief of Maintenance

Custodial Officer

ONPS    
Total Cost and FTE         160,700 5.3

 

FY 2000 Annual Performance Plan

Park/Program Id. No. FOPU (park/program four digit code) Page 02

Park/Program. Goal Id No Ia (Park Goal number)

Servicewide Goal Identification number: Ia6

NPS Servicewide Mission/Long-term Goal: Natural and Cultural resources and associated values are protected, restored and maintained in good condition and managed with their broader ecosystem and cultural context. 68% of preservation and protection conditions in park museum collections meet professional standards.

Park/Program Long-term Goal: 1a.6 - By 2002, 68% of preservation and protection conditions in park museum collections meet professional standards. Baseline Year: 1998 Target Year: 2002
Park/Program Annual Goal: 1a.6 - By September 30, 2000, 65% of preservation and protection conditions in park museum collections meet professional standards.
Performance Target this FY: 320 preservation and protection conditions in the museum collections meet professional standards Indicator: (Thing measured)

Museum Collections

Baseline Number:

444 preservation and protection conditions

Desired Condition

(Condition tag):

Meet professional standards

Unit Measure:

Preservation and protection conditions

FY99 Annual Work Plan
Work Plan Product/ Service Division Planned Output Contact Funding Category Dollars FTE
Continue operating centrally monitored fire and security alarms for fort, visitor center and maintenance, continue conducting structural fire protection through a formal fire agreement with the City of Tybee Island. Continue Cooperative Agreement with Chatham County. Ranger

Admin.

Provide contractural protection 365 days per year Chief Ranger

Admin. Officer

ONPS
Continue maintaining museum inventory on ANCS program and conducting annual inventory of museum items Ranger Review and check over 2,000 artifact records per year Ranger ONPS    
Maintain climate controlled balley building storage facility for housing artifacts Ranger Maintain climate control 365 days per year. Seal Bally Bldg. Custodial Officer

Mike Hosti

ONPS    
Total Cost and FTE         19,200 .5

 

FY 2000 Annual Performance Plan

Park/Program Id. No. FOPU (park/program four digit code) Page 03

Park/Program. Goal Id No Ia (Park Goal number)

Servicewide Goal Identification number: Ia7

NPS Servicewide Mission/Long-term Goal: Natural and Cultural resources and associated values are protected, restored and maintained in good condition and managed with their broader ecosystem and cultural context. 50% of the cultural landscapes on the Cultural Landscapes Inventory are in good condition.

Park/Program Long-term Goal: 1a7. - By 2002, 50% of the cultural landscapes on the Cultural Landscapes Inventory are in good condition. Baseline Year: 1998 Target Year: 2002
Park/Program Annual Goal: 1a7. - By September 30, 2000, 25% of the cultural landscapes on the Cultural Landscapes Inventory are in good condition.
Performance Target this FY: 175 acres within the historic district will be maintained as an historic viewshed Indicator: (Thing measured)

Historic viewshed

Baseline Number:

500 Acres

Desired Condition

(Condition tag): Good

Unit Measure: historic viewshed
FY99 Annual Work Plan
Work Plan Product/ Service Division Planned Output Contact Funding Category Dollars FTE
Maintain turf within the historic viewshed. Maintenance Mow 100 acres 17 times per year Mike Hosti ONPS
Maintain an additional 25% of turf within the historic dike at a height of 6 inches to 3 ft. by cutting with bushhog mower twice a year. Maintenance Mow 75 acres 2 times per year Mike Hosti ONPS
Maintain historic water control ditches Maintenance Mow 2 1/2 miles of ditches 3 times per year Mike Hosti ONPS
Mow around historic cottage Maintenance Mow one (1) acre of turf 24 times per year. Mike Hosti ONPS    
Mow Historic Dike Maintenance Mow outer shoulder 5 times per year. Mike Hosti ONPS    
Total Cost and FTE         168,500 4.1

 

FY 2000 Annual Performance Plan

Park/Program Id. No. FOPU (park/program four digit code) Page 04

Park/Program. Goal Id No IIa (Park Goal number)

Servicewide Goal Identification number: IIa1

NPS Servicewide Mission/Long-term Goal: Visitors safely enjoy and are satisfied with the availability, accessibility, diversity, and quality of park facilities, services, and appropriate recreational opportunities. 80% of park visitors are satisfied with appropriate park facilities, services, and recreational opportunities.

Park/Program Long-term Goal: IIa1.- By 2002, 80% of park visitors are satisfied with appropriate park facilities, services, and recreational opportunities. Baseline Year: 1998 Target Year: 2002
Park/Program Annual Goal: IIa1. - By September 30, 2000, 77% of park visitors continue to rate their satisfaction with appropriate park facilities, services, and recreational opportunities as "good" and "very good".
Performance Target this FY: 287,000 visitors are satisfied with monument facilities, services and recreational opportunities Indicator: (Thing measured)

Customer Service

Baseline Number:

372,506 Visitors

Desired Condition

(Condition tag): Good and Very Good

Unit Measure:

Public Rating

FY99 Annual Work Plan
Work Plan Product/ Service Division Planned Output Contact Funding Category Dollars FTE
Conduct management inspection of all park facilities All Divisions Conduct management inspection once per year Superintendent

Division Chiefs

ONPS/Cyclic
Clean and maintain public comfort stations Maint Clean 3 comfort stations 312 days per year Chief of Mainenance ONPS
Maintain picnic area Maint Pick-up litter and empty trash cans 312 days per year Chief of Maintenance ONPS
Maintain museum and administrative offices Maint Vaccum, dust and empty trash 312 days per year Chief of Maintenance ONPS
Maintain parking lot, trails and road shoulder Maint Pick-up litter 312 days per year Chief of Maintenance ONPS    
Provide/maintain wayside exhibits in the park and audio stations in the fort Ranger Clean and inspect 52 times per year Chief Ranger ONPS    
Total Cost and FTE         129,500 2.4

 

 

FY 2000 Annual Performance Plan

Park/Program Id. No. FOPU (park/program four digit code) Page 05

Park/Program. Goal Id No IIa (Park Goal number)

Servicewide Goal Identification number: IIa2

NPS Servicewide Mission/Long-term Goal: Visitors safely enjoy and are satisfied with the availability, accessibility, diversity, and quality of park facilities, services, and appropriate recreational opportunities. Reduce the visitor safety incident rate by 10% from 1997 levels.

Park/Program Long-term Goal: IIa2 - By 2002, reduce the visitor safety incident rate by 10% from 1997 levels. Baseline Year: 1998 Target Year: 2002
Park/Program Annual Goal: IIa2 - By September 30, 2000, 1)develop a Servicewide Baseline, and 2) reduce the visitor safety incident rate by 2%.
Performance Target this FY: Reduce visitor accident rates to 9 or fewer accidents. Indicator: (Thing measured)

Incident Rate

Baseline Number:

10 Accidents

Desired Condition

(Condition tag): Reduction 2%

Unit Measure:

Incident Rate

FY99 Annual Work Plan
Work Plan Product/ Service Division Planned Output Contact Funding Category Dollars FTE
Measure visitor safety, incident rate against 5-year average. Division Chiefs Compare visitor injury rate against 1997 level Division Chiefs ONPS
Conduct visitor security and protection patrols Ranger Patrol Cockspur and McQueen’s Islands 30 hours per week Commissioned L.E. Ranger ONPS
Complete Case Incident Reports and Investigations Ranger Chief Ranger ONPS
Maintain visitor safety signs Maint. Reset, clean, and replace FLHP signs Chief Ranger ONPS
             
Total Cost and FTE         74,000 1.3

 

FY 2000 Annual Performance Plan

Park/Program Id. No. FOPU (park/program four digit code) Page 06

Park/Program. Goal Id No IIb (Park Goal number)

Servicewide Goal Identification number: IIb.1

NPS Servicewide Mission/Long-term Goal: Park visitors and the general public understand and appreciate the preservation of parks and their resources for this and future generations. 60% of park visitors understand and appreciate the significance of the park they are visiting.

Park/Program Long-term Goal: IIb1. - By 2002, 60% of park visitors understand and appreciate the significance of the park they are visiting. Baseline Year: 1998 Target Year: 2002
Park/Program Annual Goal: IIb1. - By September 30, 2000, 1) apply and assess methodologies to measure visitor understanding and appreciation , and 2) establish a baseline.
Performance Target this FY: 223,504 visitors understand and appreciate the significance of the monument Indicator: (Thing measured)

Visitor Understanding & Education

Baseline Number:

372,506 Visitors

Desired Condition

(Condition tag): Good Understanding

Unit Measure:

Appreciation and Understanding

FY99 Annual Work Plan
Work Plan Product/ Service Division Planned Output Contact Funding Category Dollars FTE
Staff information desk in visitor center daily Ranger Staff information desk 874 hours June 1 to Sept 1 and 2,312 hours Sept 2 to May 31 Chief Ranger ONPS/Fee Program
Conduct personal service interpretive programs Ranger Conduct 5 interpretive programs daily for 4 months and 6 weekly for 8 months Chief Ranger ONPS
Provide living history programs during the year for special events Ranger Conduct 7 programs per year Chief Ranger ONPS/VIP
Operate Eastern National Book Store in the visitor center Ranger Operate bookstore 364 days per year Chief Ranger ONPS/ENM&PA
Provide personal service interpretive programs for school groups and distribute cirriculum guides to local and regional teachers planning field trips to FOPU Ranger Offer 35 personal service educational group programs per week for 8 months Chief Ranger ONPS
Conduct Visitor Survey Ranger Annually review results of survey Chief Ranger ONPS    
Provide non-personal services Ranger Review and edit web page and informational handouts annually Chief Ranger ONPS    
Total Cost and FTE         286,100 7.4

 

 

FY 2000 Annual Performance Plan

Park/Program Id. No. FOPU (park/program four digit code) Page 07

Park/Program. Goal Id No IVa (Park Goal number)

Servicewide Goal Identification number: IVa2

NPS Servicewide Mission/Long-term Goal: The National Park Service uses current management practices, systems, and technologies to accomplish its mission. 100% of employees within the 16 key occupational groups have essential competency needs identified for their positions.

Park/Program Long-term Goal: IVa2. - By 2002, 100% of employees within the key 16 occupational groups have essential competency needs identified for their position. Baseline Year: 1998 Target Year: 2002
Park/Program Annual Goal: IVa2 - By September 30, 2000, 40% of employees (perm and term) have participated in a servicewide training and development needs assessment.
Performance Target this FY: 10 permanent employees have essential competency needs identified for their position. Indicator: (Thing measured)

Competencies

Baseline Number:

13 employees

Desired Condition

(Condition tag):

Needs identified

Unit Measure:

Competencies

FY99 Annual Work Plan
Work Plan Product/ Service Division Planned Output Contact Funding Category Dollars FTE
Review Position Descriptions identifying training needs of current employees. Admin. Conduct 15 annual reviews Admin. Officer

Division Chiefs

ONPS
Provide formal training opportunities, cross-training assignments and special training opportunities (YCC, detail assignments, ect.) Admin. Provide 1560 hours of career enrichment opportunity for employees Admin. Officer and Division Chiefs ONPS
   

 

         
Total Cost and FTE         32,000 .5

 

FY 2000 Annual Performance Plan

Park/Program Id. No. FOPU (park/program four digit code) Page 08

Park/Program. Goal Id No IVa (Park Goal number)

Servicewide Goal Identification number: IVa3

NPS Servicewide Mission/Long-term Goal: The National Park Service uses current management practices, systems, and technologies to accomplish its mission. 100% of employees within the 16 key occupational groups have essential competency needs identified for their positions.

Park/Program Long-term Goal: IVa3. - By 2002, 100% of employee performance standards will be linked to appropriate strategic and annual performance goals. Baseline Year: 1998 Target Year: 2002
Park/Program Annual Goal: IVa3 - By September 30, 2000, four employee's (perm and term) performance standards will be linked to appropriate strategic and annual performance goals.
Performance Target this FY: Four permanent employee's performance standards linked to appropriate strategic and annual performance goals. Indicator: (Thing measured)

Performance Standards

Baseline Number:

13 employees

Desired Condition

(Condition tag):

Linked

Unit Measure:

# of perm. employees w/perf stds linked

FY99 Annual Work Plan
Work Plan Product/ Service Division Planned Output Contact Funding Category Dollars FTE
Link standards of all managers and supervisors to organizational strategic and annual performance goals. All Change manager and supervisors performance standards to requirement Division Chiefs ONPS
 

 

   

 

         
Total Cost and FTE         12,000 .1

 

FY 2000 Annual Performance Plan

Park/Program Id. No. FOPU (park/program four digit code) Page 09

Park/Program. Goal Id No IVa (Park Goal number)

Servicewide Goal Identification number: Iva4

NPS Servicewide Mission/Long-term Goal: The National Park Service uses current management practices, systems, and technologies to accomplish its mission. The populations of annual new hires reflects the overall diversity of the Civilian Labor Force.

Park/Program Long-term Goal: IVa4 – Workforce Diversity – Increase by 25%, over 1998 levels, the representation of underrepresented groups in each of the targeted occupational series in the NPS permanent workforce Baseline Year: 1998 Target Year: 2002
Park/Program Annual Goal: IVa 4 - By September 30, 2000, increase the representation of underrepresented groups in each of the targeted occupational series by 5% over each series’ 1998 baseline through merit promotion selections, new appointments, and other means of accessions.
Performance Target this FY: 11 permanent positions reflect the Civilian Labor Force. Indicator: (Thing measured) Employee Diversity Baseline Number:

13 positions

Desired Condition

(Condition tag):

Equal Representation

Unit Measure:

Diversity

FY99 Annual Work Plan
Work Plan Product/ Service Division Planned Output Contact Funding Category Dollars FTE
Conduct annual seasonal recruitment programs at Savannah State University, Armstrong – Atlantic State University, First African Baptist Church, City of Savannah Department of Labor, Savannah Technical Institute, Beach Institute and Chatham Co. Family and Child Svcs. Admin. Conduct 6 diversity recruitment efforts and job information seminars per year. Administrative Officer ONPS
Use Student hiring authorities to fill seasonal positions. All Use STEP or SCEP program(s) under Schedule B of CFR 5, to hire one (1) seasonal employee. Administrative Officer ONPS
             
Total Cost and FTE         12,000 .7

 

FY 2000 Annual Performance Plan

Park/Program Id. No. FOPU (park/program four digit code) Page 10

Park/Program. Goal Id No IVa (Park Goal number)

Servicewide Goal Identification number: IVa6a

NPS Servicewide Mission/Long-term Goal: The National Park Service uses current management practices, systems, and technologies to accomplish its mission.

Park/Program Long-term Goal: IVa6a. – By 2002, Lost Time injuries and Worker's Compensation claims will be reduced by 50%, from the 1996 level, the NPS employee lost time injury rate Baseline Year: 1998 Target Year: 2002
Park/Program Annual Goal: IVa6a - By September 30, 2000, there will be a 20% reduction of Lost Time injuries and Worker's Compensation claims from the 1996 level.
Performance Target this FY: 20% reduction in Lost Time injuries and Worker's Compensation claims. Indicator: (Thing measured)

Employee Lost Time Injury Rate

Baseline Number:

FY 1996 Number

Desired Condition

(Condition tag):

Reduced

Unit Measure:

Incident Rate

FY99 Annual Work Plan
Work Plan Product/ Service Division Planned Output Contact Funding Category Dollars FTE
Provide monthly staff wide safety message All 10 to 15 minute safety message provided at staff meetings Division Chiefs ONPS 0.1
Conduct monthly safety management safety inspections of park All One annual inspection of all buildings and grounds Division Chiefs ONPS
Provide safety awareness training to all seasonal employees All One hour block of instruction for all new and seasonal employees Division Chiefs ONPS
Conduct "tailgate" safety session prior to conducting high risk projects Maintenance and Ranger On the spot, and on-site safety briefings throughout the park Safety Officer ONPS .01
Hold monthly Safety Committee Meetings Division Chiefs Meetings held each month Safety Committee Chairperson ONPS    
Total Cost and FTE         16,000 .2

 

FY 2000 Annual Performance Plan

Park/Program Id. No. FOPU (park/program four digit code) Page 11

Park/Program. Goal Id No IVb (Park Goal number)

Servicewide Goal Identification number: Ivb1

NPS Servicewide Mission/Long-term Goal: The National Park Service increases its managerial resources through initiatives and support from other agencies, organizations, and individuals.

Park/Program Long-term Goal: IVb1. - By 2002, Increase by 10%, over the 1997 level, the number of volunteer hours. Baseline Year: 1998 Target Year: 2002
Park/Program Annual Goal: IVb1- By September 30, 2000, increase the number of volunteer hours by 4% over the 1997 level.
Performance Target this FY: 4% increase in volunteer hours over the 1997 level. Indicator: (Thing measured)

Volunteer Hours

Baseline Nuber:

FY 1997 Amount

Desired Condition

(Condition tag):

Increase

Unit Measure:

Volunteer Hours

FY99 Annual Work Plan
Work Plan Product/ Service Division Planned Output Contact Funding Category Dollars FTE
Conduct volunteer recruitment All Recruit volunteers from various sources Division Chiefs ONPS .1
Produce Letters of Appreciation, Certificates and awards All Provide Volunteer recognition to retain volunteers Division Chiefs
Provide volunteer training All Provide on-the-job training in the specific tasks to be accomplished. Division Chiefs
Provide Volunteer Supervision All Schedule, track time, maintain personnel file(s). Division Chiefs ONPS
             
Total Cost and FTE         17,000 .1

 

FY 2000 Annual Performance Plan

Park/Program Id. No. FOPU (park/program four digit code) Page 12

Park/Program. Goal Id No IVb (Park Goal number)

Servicewide Goal Identification number: Ivb2a

NPS Servicewide Mission/Long-term Goal: The National Park Service increases its managerial resources through initiatives and support from other agencies, organizations, and individuals.

Park/Program Long-term Goal: IVb2A. - By 2002, Increase by 10%, over the 1997 level, the dollar amount of donations and grants. Baseline Year: 1998 Target Year: 2002
Park/Program Annual Goal: IVb2A- By September 30, 2000, increase by 4%, from the 1997 level , the value of donations.
Performance Target this FY: 4% increase in dollar amount of donations over the 1997 level. Indicator: (Thing measured)

Cash Donations from all Sources

Baseline Number:

FY 1997 Amount

Desired Condition

(Condition tag):

Increase

Unit Measure:

Dollars

FY99 Annual Work Plan
Work Plan Product/ Service Division Planned Output Contact Funding Category Dollars FTE
Conduct efficient Eastern National sales outlet Ranger Coordinate EN sales outlet Chief Ranger ONPS .2
Maintain Donation Box in Visitor Center Ranger Promote and deposit visitor donation box Chief Ranger ONPS
   

 

         
Total Cost and FTE         14,000 .2

 

FY 2000 Annual Performance Plan

Park/Program Id. No. FOPU (park/program four digit code) Page 13

Park/Program. Goal Id No IVb (Park Goal number)

Servicewide Goal Identification number: Ivb4

NPS Servicewide Mission/Long-term Goal: The National Park Service increases its managerial resources through initiatives and support from other agencies, organizations, and individuals.

Park/Program Long-term Goal: IVb4. - By 2002, Increase by 20%, over the 1997 level, the amount of receipts from park entrance, recreation, and other fees. Baseline Year: 1998 Target Year: 2002
Park/Program Annual Goal: IVb4- By September 30, 2000, increase the amount of receipts collected from park entrance, recreation, and other fees by 8%, over the 1997 levels.
Performance Target this FY: 8% increase in dollar amount of fee receipts over the 1997 level. Indicator: (Thing measured)

Fee Receipt Dollars

Baseline Number:

FY 1997 Amount

Desired Condition

(Condition tag):

Increase

Unit Measure:

Dollars

FY99 Annual Work Plan
Work Plan Product/ Service Division Planned Output Contact Funding Category Dollars FTE
Conduct efficient entrance fee operation in visitor center. Ranger Entrance fee collection operation for 8 months Chief Ranger ONPS 1
Conduct efficient entrance fee operation at fee booth. Ranger Entrance fee collection operation for 4 months Chief Ranger Fund 20 1
             
Total Cost and FTE         14,500 .4